At a glance

Greenfield (UNKNOWN108969 - STONEWALL) is a greenfield datacenter candidate site in FREDERICK, West Virginia, scoring 52.2/100 DC Readiness — 7th of 82 scored sites in the county. Its nearest substation is UNKNOWN108969. It sits in the PJM grid region, where interconnection has averaged 3.0 years from request to operation. GridCensus catalogs 100 MW of candidate capacity here.

Power & interconnection

Nearest substationUNKNOWN108969
Substation voltage138 kV
Available capacity100 MW

Speed to power

Interconnection outlookFavorable
≈ 3.0 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionPJM
Queue depth130
Avg queue wait3.0 yrs
Recent queue wait3.0 yrs
Completion rate23%
Withdrawal rate77%

Connectivity

Nearest IXPDataBank Ashburn (IAD1)
IXP distance53.8 mi
Fiber providers7
Fiber coverage52.7%

Site characteristics

Site typeGreenfield

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score70/100

Location context

Nearest datacenterMiddletown Data Center
DC distance19.2 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.20¢/kWh
Industrial electricity8.97¢/kWh
Cooling degree days1,300
Heating degree days4,000
Land price / acre$7,861

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Greenfield (UNKNOWN108969 - STONEWALL)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Greenfield (UNKNOWN108969 - STONEWALL) compare with other sites in FREDERICK?

Greenfield (UNKNOWN108969 - STONEWALL) ranks 7th of 82 scored candidate sites in FREDERICK. Its 52.2/100 is roughly in line with the county average of 51.5. It is roughly in line with the West Virginia average of 52.0 and roughly in line with the national average of 53.2.

Against the West Virginia average, its strongest sub-score is speed to power (54 vs 50) and its weakest is natural hazard (70 vs 77). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Greenfield (UNKNOWN108969 - STONEWALL) to power, fiber and other datacenters?

The nearest mapped substation, UNKNOWN108969, is the closest grid connection point on record and operates at 138 kV. The nearest located transmission bottleneck is GOOSECRE TX1 XFORMER H 500 KV (PJM), 50 miles away. For connectivity, the nearest internet exchange facility is DataBank Ashburn (IAD1) at 53.8 miles. 7 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Middletown Data Center, 19.2 miles away.

What are the flood, water and hazard risks at Greenfield (UNKNOWN108969 - STONEWALL)?

At the county level, FEMA's National Risk Index rates FREDERICK "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
54
Fiber connectivity12%
62
Energy cost10%
50
Water risk7%
88
Natural hazard6%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
46
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
60

Nearby comparable sites

Other scored datacenter candidate sites in FREDERICK, ranked by DC Readiness.

Sites near Greenfield (UNKNOWN108969 - STONEWALL)
SiteTypeVoltageCapacityQueue waitScore
OZ FrederickGreenfield——5.1 yrs61.5
FISHER DIAGNOSTICS (IN-VITRO DIAGNOSTIC SUBSTANCE MANUFACTURING)Manufacturing——5.1 yrs52.4
CHEMSTONE CORP. (CUT STONE AND STONE PRODUCT MANUFACTURING)Manufacturing——5.1 yrs52.4
VALLEY TRADER (PREPRESS SERVICES)Manufacturing——5.1 yrs52.4
STOWE-WOODWARD, INC. (ALL OTHER RUBBER PRODUCT MANUFACTURING)Manufacturing——5.1 yrs52.4
TABARD CORP. (OTHER SNACK FOOD MANUFACTURING)Manufacturing——5.1 yrs52.3
Bluestone Industrial ParkShovel-Ready——5.1 yrs52.1
One Logistics Park - Phase BShovel-Ready——5.1 yrs51.9

Greenfield (UNKNOWN108969 - STONEWALL): common questions

What is the DC Readiness score of Greenfield (UNKNOWN108969 - STONEWALL)?

Greenfield (UNKNOWN108969 - STONEWALL) scores 52.2/100 on the GridCensus DC Readiness scale, rated fair. It ranks 7th of 82 scored sites in FREDERICK. The FREDERICK average is 51.5 and the West Virginia average is 52.0.

What is the nearest substation to Greenfield (UNKNOWN108969 - STONEWALL)?

The nearest mapped substation is UNKNOWN108969, at 138 kV. GridCensus catalogs 100 MW of candidate capacity for the site.

What grid region is Greenfield (UNKNOWN108969 - STONEWALL) in?

Greenfield (UNKNOWN108969 - STONEWALL) is in the PJM region. Projects interconnecting there have averaged a 3.0-year wait from queue request to operation.

How far is Greenfield (UNKNOWN108969 - STONEWALL) from an internet exchange?

The nearest internet exchange facility is DataBank Ashburn (IAD1), about 53.8 miles away; 7 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Greenfield (UNKNOWN108969 - STONEWALL), FREDERICK, WV”, https://gridcensus.com/datacenter-sites/west-virginia/frederick/greenfield-unknown108969-stonewall-c7211499 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Greenfield (UNKNOWN108969 - STONEWALL), FREDERICK is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.