OZ Frederick
GreenfieldFREDERICK, Virginia · PJM
OZ Frederick is a greenfield datacenter candidate site in FREDERICK, Virginia, interconnecting through PJM. It screens at 61.6/100 DC Readiness and a 3.1 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
Largest US DC market; incentive preserved but a new $0.011/kWh DC electricity tax starts Jul 2026.
Dominion GS-5 large-load rate (≥25 MW, ~$1.5M/MW collateral, 14-yr term) effective 2027.
Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
Site location
Get alerts
Track OZ Frederick
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in FREDERICK, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| CHEMSTONE CORP. (CUT STONE AND STONE PRODUCT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 54.3 |
| VALLEY TRADER (PREPRESS SERVICES) | Manufacturing | — | — | 3.5 yrs | 54.2 |
| STOWE-WOODWARD, INC. (ALL OTHER RUBBER PRODUCT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 54.2 |
| FISHER DIAGNOSTICS (IN-VITRO DIAGNOSTIC SUBSTANCE MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 54.2 |
| TABARD CORP. (OTHER SNACK FOOD MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 54.2 |
| CRIDER & SHOCKEY, INC. (READY-MIX CONCRETE MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 53.5 |
| CIVES STEEL CO., MID-ATLANTIC DIV. (IRON AND STEEL MILLS) | Manufacturing | — | — | 3.5 yrs | 53.5 |
| SOUTHEASTERN CONTAINER, INC. (PLASTICS BOTTLE MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 53.5 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen