Datacenter Sites in Richmond City, Virginia
Richmond City has 158 scored datacenter candidate sites averaging 57.8/100 DC Readiness, with a catalogued aggregate of 5,730 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.
158
Candidate sites
57.8/100
Avg DC Readiness
5,730 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
Site-selection context for Richmond City
Yessales_tax_exemption
Datacenter tax incentive
4.81¢/kWh
Commercial electricity
4.19¢/kWh
Industrial electricity
4
Fiber providers
Low
Water stress
$5,900
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp
Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
By site type
Top datacenter sites in Richmond City
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| BASIN | Substation-Adjacent | 230 kV | 300 MW | 3.8 yrs | 67.3 |
| LAKESIDE | Substation-Adjacent | 230 kV | 300 MW | 3.8 yrs | 67.0 |
| SPRUANCE NUG | Substation-Adjacent | 230 kV | 300 MW | 3.8 yrs | 65.9 |
| NORTHWEST | Substation-Adjacent | 230 kV | 300 MW | 3.8 yrs | 65.7 |
| EC Near Bellmeade Power Station | Greenfield | — | — | 3.1 yrs | 65.6 |
| CHARLES CITY ROAD | Substation-Adjacent | 230 kV | 300 MW | 3.8 yrs | 65.3 |
| NORTHEAST | Substation-Adjacent | 230 kV | 300 MW | 3.8 yrs | 65.2 |
| TAP146366 | Substation-Adjacent | 230 kV | 300 MW | 3.8 yrs | 65.0 |
| EC Near Bellmeade Power Station | Greenfield | — | — | 3.1 yrs | 64.6 |
| PLAZA | Substation-Adjacent | 230 kV | 300 MW | 3.8 yrs | 64.5 |
| SOUTHWEST | Substation-Adjacent | 230 kV | 300 MW | 3.8 yrs | 64.4 |
| Stone Brewing Company | Brownfield | — | — | 3.8 yrs | 64.1 |
| TRABUE | Substation-Adjacent | 230 kV | 300 MW | 3.8 yrs | 63.9 |
| OZ Richmond | Greenfield | — | — | 3.1 yrs | 63.7 |
| EC Near Spruance Operating Services LLC | Greenfield | — | — | 3.1 yrs | 63.6 |
| EC Near Bellmeade Power Station | Greenfield | — | — | 3.1 yrs | 62.6 |
| OZ Richmond | Greenfield | — | — | 3.1 yrs | 62.0 |
| SHOCKOE | Substation-Adjacent | 115 kV | 100 MW | 3.8 yrs | 61.6 |
| TWELVTH STREET | Substation-Adjacent | 115 kV | 100 MW | 3.8 yrs | 61.4 |
| ACCA | Substation-Adjacent | 115 kV | 100 MW | 3.8 yrs | 61.3 |
| UNKNOWN115879 | Substation-Adjacent | 115 kV | 100 MW | 3.8 yrs | 61.3 |
| EC Coal Richmond city | Greenfield | — | — | 3.1 yrs | 61.2 |
| TAP147862 | Substation-Adjacent | 115 kV | 100 MW | 3.8 yrs | 61.1 |
| UNKNOWN115809 | Substation-Adjacent | 115 kV | 100 MW | 3.8 yrs | 60.3 |
| MARLBORO | Substation-Adjacent | 115 kV | 100 MW | 3.8 yrs | 60.1 |
Richmond City datacenter FAQ
- How many datacenter sites are in Richmond City?
- 158 scored datacenter candidate sites, averaging 57.8/100 DC Readiness.
- Does Richmond City offer datacenter tax incentives?
- Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
- What is the natural-hazard risk in Richmond City?
- FEMA's National Risk Index rates Richmond City as "Relatively Moderate" (score 30).
- What are industrial electricity rates in Richmond City?
- Average industrial electricity is 4.19¢/kWh and commercial is 4.81¢/kWh in Richmond City.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Richmond City, Virginia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.