Datacenter Sites in ROANOKE (CITY), Virginia

ROANOKE (CITY) has 154 scored datacenter candidate sites averaging 52.4/100 DC Readiness, with a catalogued aggregate of 2,200 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

154
Candidate sites
52.4/100
Avg DC Readiness
2,200 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in ROANOKE (CITY)

Site-selection context for ROANOKE (CITY)

Yessales_tax_exemption
Datacenter tax incentive
8.15¢/kWh
Commercial electricity
5.84¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$5,900
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

By site type

Top datacenter sites in ROANOKE (CITY)

Top datacenter sites in ROANOKE (CITY)
SiteTypeVoltageCapacityQueue waitScore
CLOVERDALE 765KVSubstation-Adjacent765 kV1,000 MW3.8 yrs65.0
OZ RoanokeGreenfield——3.1 yrs61.0
OZ RoanokeGreenfield——3.1 yrs60.1
OZ RoanokeGreenfield——3.1 yrs58.9
ROANOKESubstation-Adjacent138 kV100 MW3.8 yrs56.6
UNKNOWN121155Substation-Adjacent138 kV100 MW3.8 yrs56.6
UNKNOWN114181Substation-Adjacent138 kV100 MW3.8 yrs56.6
BENNINGTONSubstation-Adjacent138 kV100 MW3.8 yrs56.6
BONSACKSubstation-Adjacent138 kV100 MW3.8 yrs56.6
UNKNOWN171704Substation-Adjacent138 kV100 MW3.8 yrs56.6
STARKEYSubstation-Adjacent138 kV100 MW3.8 yrs56.5
CLEARBROOKSubstation-Adjacent138 kV100 MW3.8 yrs56.5
LAKE FORESTSubstation-Adjacent138 kV100 MW3.8 yrs56.5
VINTONSubstation-Adjacent138 kV100 MW3.8 yrs56.5
CAVE SPRINGSubstation-Adjacent138 kV100 MW3.8 yrs56.5
BURLINGTONSubstation-Adjacent138 kV100 MW3.8 yrs56.4
SAFEHOUSE SIGNS, INC. (SIGN MANUFACTURING)Manufacturing——3.5 yrs53.0
ADAMS CONSTRUCTION CO. (H Q) (ASPHALT PAVING MIXTURE AND BLOCK MANUFACTURING)Manufacturing——3.5 yrs53.0
BEEF PRODUCTS VENTURE (ANIMAL (EXCEPT POULTRY) SLAUGHTERING)Manufacturing——3.5 yrs53.0
ROANOKE AUTO SPRING WORKS, INC. (SPRING (HEAVY GAUGE) MANUFACTURING)Manufacturing——3.5 yrs53.0
CYCLE SYSTEMS, INC. (H Q) (SECONDARY SMELTING, REFINING, AND ALLOYING OF NONFERROUS METAL (EXCEPT COPPER AND ALUMINUM))Manufacturing——3.5 yrs53.0
HANSON PIPE & PRECAST, INC. (CONCRETE PIPE MANUFACTURING)Manufacturing——3.5 yrs53.0
HUB CORP. (INDUSTRIAL PATTERN MANUFACTURING)Manufacturing——3.5 yrs53.0
VINTON SCRAP & METALS, INC. (NOT AVAILABLE)Manufacturing——3.5 yrs53.0
SARVER'S HYDRAULIC & PNEUMATIC (OTHER METALWORKING MACHINERY MANUFACTURING)Manufacturing——3.5 yrs53.0

ROANOKE (CITY) datacenter FAQ

How many datacenter sites are in ROANOKE (CITY)?
154 scored datacenter candidate sites, averaging 52.4/100 DC Readiness.
Does ROANOKE (CITY) offer datacenter tax incentives?
Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
What is the natural-hazard risk in ROANOKE (CITY)?
FEMA's National Risk Index rates ROANOKE (CITY) as "Relatively Moderate" (score 30).
What are industrial electricity rates in ROANOKE (CITY)?
Average industrial electricity is 5.84¢/kWh and commercial is 8.15¢/kWh in ROANOKE (CITY).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ROANOKE (CITY), Virginia. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.