Datacenter Sites in ROANOKE (CITY), Virginia

ROANOKE (CITY) has 154 scored datacenter candidate sites averaging 51.3/100 DC Readiness, with a catalogued aggregate of 2,200 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

ROANOKE (CITY), Virginia has 154 scored datacenter candidate sites averaging 51.3/100 DC Readiness, roughly in line with the Virginia average of 52.2. It ranks 5th of 122 Virginia counties by number of sites and 82nd by average score. The top-scoring site is CLOVERDALE 765KV at 65.3/100.

154
Candidate sites
51.3/100
Avg DC Readiness
2,200 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in ROANOKE (CITY)

Site-selection context for ROANOKE (CITY)

Yessales_tax_exemption
Datacenter tax incentive
8.15¢/kWh
Commercial electricity
5.84¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$5,900
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

How does ROANOKE (CITY) compare with other counties in Virginia?

By number of scored sites, ROANOKE (CITY) ranks 5th of the 122 Virginia counties with a county page, holding 2.6% of the state's 5,871 sites. Its average DC Readiness of 51.3/100 ranks 82nd in the state and is roughly in line with the national average of 53.0. Nationally it has the 167th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 16 score 55 or higher.

What types of datacenter sites are in ROANOKE (CITY)?

Manufacturing sites are the most common (82, 53% of the county's inventory), followed by shovel-ready (29) and industrial (27). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in ROANOKE (CITY)?

Industrial electricity averages 5.84¢/kWh and commercial 8.15¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 5 fiber providers report service in the county. The climate runs 1,300 cooling degree days a year with a mean temperature of 55°F. Land is valued around $5,900 an acre.

By site type

Top datacenter sites in ROANOKE (CITY)

Top datacenter sites in ROANOKE (CITY)
SiteTypeVoltageCapacityQueue waitScore
CLOVERDALE 765KVSubstation-Adjacent765 kV1,000 MW5.1 yrs65.3
OZ RoanokeGreenfield——5.1 yrs60.4
OZ RoanokeGreenfield——5.1 yrs59.5
OZ RoanokeGreenfield——5.1 yrs58.3
VINTONSubstation-Adjacent138 kV100 MW5.1 yrs56.9
BENNINGTONSubstation-Adjacent138 kV100 MW5.1 yrs56.9
STARKEYSubstation-Adjacent138 kV100 MW5.1 yrs56.9
UNKNOWN121155Substation-Adjacent138 kV100 MW5.1 yrs56.9
ROANOKESubstation-Adjacent138 kV100 MW5.1 yrs56.9
UNKNOWN171704Substation-Adjacent138 kV100 MW5.1 yrs56.9
UNKNOWN114181Substation-Adjacent138 kV100 MW5.1 yrs56.9
BONSACKSubstation-Adjacent138 kV100 MW5.1 yrs56.9
CAVE SPRINGSubstation-Adjacent138 kV100 MW5.1 yrs56.9
LAKE FORESTSubstation-Adjacent138 kV100 MW5.1 yrs56.8
CLEARBROOKSubstation-Adjacent138 kV100 MW5.1 yrs56.8
BURLINGTONSubstation-Adjacent138 kV100 MW5.1 yrs56.7
Roanoke Centre for Industry and Technology-Tract 8Shovel-Ready——5.1 yrs50.8
VINTON SCRAP & METALS, INC. (NOT AVAILABLE)Manufacturing——5.1 yrs50.6
120 Salem Avenue SWShovel-Ready——5.1 yrs50.6
VIRGINIA TRANSFORMER CORP. (ELECTRONIC COIL, TRANSFORMER, AND OTHER INDUCTOR MANUFACTURING)Manufacturing——5.1 yrs50.6
Shaffer Crossing WarehouseShovel-Ready——5.1 yrs50.6
Former Evans Paint, Inc. PropertyIndustrial——5.1 yrs50.6
One Ten FranklinShovel-Ready——5.1 yrs50.6
Amphitheater/Armory PropertyIndustrial——5.1 yrs50.6
MAGNETS U. S. A. (ALL OTHER MISCELLANEOUS FABRICATED METAL PRODUCT MANUFACTURING)Manufacturing——5.1 yrs50.6

Every scored site in ROANOKE (CITY)

All 154 sites, best first.

ROANOKE (CITY) datacenter FAQ

How many datacenter sites are in ROANOKE (CITY)?

154 scored datacenter candidate sites, averaging 51.3/100 DC Readiness. That is the 5th-most of 122 Virginia counties with five or more sites.

What is the highest-scoring datacenter site in ROANOKE (CITY)?

CLOVERDALE 765KV scores 65.3/100 DC Readiness, the highest of the 154 scored sites in ROANOKE (CITY) (a substation-adjacent site).

Does ROANOKE (CITY) offer datacenter tax incentives?

Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

What is the natural-hazard risk in ROANOKE (CITY)?

FEMA's National Risk Index rates ROANOKE (CITY) as "Relatively Moderate" (score 30).

What are industrial electricity rates in ROANOKE (CITY)?

Average industrial electricity is 5.84¢/kWh and commercial is 8.15¢/kWh in ROANOKE (CITY).

More in Virginia

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 13, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in ROANOKE (CITY), Virginia”, https://gridcensus.com/datacenter-sites/virginia/roanoke-city (data as of November 13, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for ROANOKE (CITY), Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.