Datacenter Sites in Warren, Virginia

Warren has 20 scored datacenter candidate sites averaging 52.7/100 DC Readiness, with a catalogued aggregate of 1,300 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

Warren, Virginia has 20 scored datacenter candidate sites averaging 52.7/100 DC Readiness, roughly in line with the Virginia average of 52.2. It ranks 76th of 122 Virginia counties by number of sites and 50th by average score. The top-scoring site is Substation-Adjacent site · d6c14016 at 65.3/100.

20
Candidate sites
52.7/100
Avg DC Readiness
1,300 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 20 in Warren

Site-selection context for Warren

Yessales_tax_exemption
Datacenter tax incentive
10.05¢/kWh
Commercial electricity
7.55¢/kWh
Industrial electricity
4
Fiber providers
Low
Water stress
$8,337
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

How does Warren compare with other counties in Virginia?

By number of scored sites, Warren ranks 76th of the 122 Virginia counties with a county page, holding 0.3% of the state's 5,871 sites. Its average DC Readiness of 52.7/100 ranks 50th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1729th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 5 score 55 or higher.

What types of datacenter sites are in Warren?

Manufacturing sites are the most common (12, 60% of the county's inventory), followed by substation-adjacent (4) and shovel-ready (3). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Warren?

Industrial electricity averages 7.55¢/kWh and commercial 10.05¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 4 fiber providers report service in the county. The climate runs 1,300 cooling degree days a year with a mean temperature of 55°F. Land is valued around $8,337 an acre.

By site type

Top datacenter sites in Warren

Top datacenter sites in Warren
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN121555Substation-Adjacent500 kV1,000 MW5.1 yrs65.3
OZ WarrenGreenfield——5.1 yrs58.5
TAP140501Substation-Adjacent138 kV100 MW5.1 yrs56.9
UNKNOWN121558Substation-Adjacent138 kV100 MW5.1 yrs56.9
STRASBURGSubstation-Adjacent138 kV100 MW5.1 yrs56.9
Avtex RedevelopmentShovel-Ready——5.1 yrs51.1
INTERBAKE FOODS, LLC (COMMERCIAL BAKERIES)Manufacturing——5.1 yrs50.6
E. I. DU PONT DE NEMOURS & CO. (PAINT AND COATING MANUFACTURING)Manufacturing——5.1 yrs50.6
ESSROC CEMENT CORP. (ALL OTHER MISCELLANEOUS NONMETALLIC MINERAL PRODUCT MANUFACTURING)Manufacturing——5.1 yrs50.6
CREATIVE COATINGS, INC. (METAL COATING, ENGRAVING (EXCEPT JEWELRY AND SILVERWARE), AND ALLIED SERVICES TO MANUFACTURERS)Manufacturing——5.1 yrs50.6
JACKSON FURNITURE INDUSTRIES, INC. (UPHOLSTERED HOUSEHOLD FURNITURE MANUFACTURING)Manufacturing——5.1 yrs50.6
Interstate 66 Industrial Park - Building 1Shovel-Ready——5.1 yrs50.6
VALLEY REDI-MIX CO., INC. (READY-MIX CONCRETE MANUFACTURING)Manufacturing——5.1 yrs50.6
NATIONAL MEDIA SERVICES, INC. (PRERECORDED COMPACT DISC (EXCEPT SOFTWARE), TAPE, AND RECORD REPRODUCING)Manufacturing——5.1 yrs50.6
RPS SHENANDOAH, INC. (PLASTICS PIPE AND PIPE FITTING MANUFACTURING)Manufacturing——5.1 yrs50.6
Interstate 66 Industrial Park - Building 2Shovel-Ready——5.1 yrs50.6
TORAY PLASTICS AMERICA, INC. (POLYSTYRENE FOAM PRODUCT MANUFACTURING)Manufacturing——5.1 yrs50.6
AIRPAC, INC. (AIR-CONDITIONING & WARM AIR HEATING EQUIPMENT & COMMERCIAL AND INDUSTRIAL REFRIGERATION EQUIPMENT MFG.)Manufacturing——5.1 yrs50.5
WILLIAMS BROS. STRIKE FIRST, INC. (METAL WINDOW AND DOOR MANUFACTURING)Manufacturing——5.1 yrs50.5
NORTH AMERICAN HOUSING CORP. (MANUFACTURED HOME (MOBILE HOME) MANUFACTURING)Manufacturing——5.1 yrs50.4

Every scored site in Warren

All 20 sites, best first.

Warren datacenter FAQ

How many datacenter sites are in Warren?

20 scored datacenter candidate sites, averaging 52.7/100 DC Readiness. That is the 76th-most of 122 Virginia counties with five or more sites.

What is the highest-scoring datacenter site in Warren?

Substation-Adjacent site · d6c14016 scores 65.3/100 DC Readiness, the highest of the 20 scored sites in Warren (a substation-adjacent site).

Does Warren offer datacenter tax incentives?

Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

What is the natural-hazard risk in Warren?

FEMA's National Risk Index rates Warren as "Relatively Moderate" (score 30).

What are industrial electricity rates in Warren?

Average industrial electricity is 7.55¢/kWh and commercial is 10.05¢/kWh in Warren.

More in Virginia

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Warren, Virginia”, https://gridcensus.com/datacenter-sites/virginia/warren (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Warren, Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.