Skip to content
Gridcensus

Interstate 66 Industrial Park - Building 1

Shovel-Ready

Warren, Virginia · PJM

DC Readiness
50.3
Fair / 100

Interstate 66 Industrial Park - Building 1 is a shovel-ready datacenter candidate site in Warren, Virginia, interconnecting through PJM. It screens at 50.3/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

UtilityRAPPAHANNOCK ELECTRIC COOPcooperativemoderate to large load · terms ≥ 25 MW

Speed to power

Interconnection outlookConstrained
≈ 3.8 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionPJM
Queue depth878
Avg queue wait3.8 yrs

Connectivity

Nearest IXPDigital Realty GNV (8217 Linton Hall)
IXP distance33.9 mi
Fiber providers4
Fiber coverage39.4%

Site characteristics

Site typeShovel-Ready

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score70/100

Location context

Nearest datacenterMiddletown Data Center
DC distance7.2 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.05¢/kWh
Industrial electricity7.55¢/kWh
Cooling degree days1,300
Heating degree days4,000
Land price / acre$8,337

Regulatory climate

Moderatestate posture · as of 2026-08

Largest US DC market; incentive preserved but a new $0.011/kWh DC electricity tax starts Jul 2026.

DC tax incentiveYes
Large-load threshold≥ 25 MW

Dominion GS-5 large-load rate (≥25 MW, ~$1.5M/MW collateral, 14-yr term) effective 2027.

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Interstate 66 Industrial Park - Building 1

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
41
Fiber connectivity12%
61
Energy cost10%
50
Water risk7%
88
Natural hazard6%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
46
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
60

Nearby comparable sites

Other scored datacenter candidate sites in Warren, ranked by DC Readiness.

Sites near Interstate 66 Industrial Park - Building 1
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN121555Substation-Adjacent500 kV1,000 MW3.8 yrs65.0
OZ WarrenGreenfield——3.1 yrs59.1
TAP140501Substation-Adjacent138 kV100 MW3.8 yrs56.6
STRASBURGSubstation-Adjacent138 kV100 MW3.8 yrs56.6
UNKNOWN121558Substation-Adjacent138 kV100 MW3.8 yrs56.6
JACKSON FURNITURE INDUSTRIES, INC. (UPHOLSTERED HOUSEHOLD FURNITURE MANUFACTURING)Manufacturing——3.5 yrs53.0
ESSROC CEMENT CORP. (ALL OTHER MISCELLANEOUS NONMETALLIC MINERAL PRODUCT MANUFACTURING)Manufacturing——3.5 yrs53.0
INTERBAKE FOODS, LLC (COMMERCIAL BAKERIES)Manufacturing——3.5 yrs53.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Interstate 66 Industrial Park - Building 1, Warren. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.