Skip to content
Gridcensus

OZ Warren

Greenfield

Warren, Virginia · PJM

DC Readiness
59.1
Good / 100

OZ Warren is a greenfield datacenter candidate site in Warren, Virginia, interconnecting through PJM. It screens at 59.1/100 DC Readiness and a 3.1 yrs average interconnection-queue wait.

Power & interconnection

LMP zonePJM_DOM
Wholesale LMP$43.92/MWh
Utility commercial rate0.10¢/kWh
UtilityRAPPAHANNOCK ELECTRIC COOPcooperativemoderate to large load · terms ≥ 25 MW

Speed to power

Interconnection outlookConstrained
≈ 3.6 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionPJM
Queue depth878
Avg queue wait3.1 yrs
Recent queue wait3.6 yrs
Completion rate20%
Withdrawal rate80%

Connectivity

Nearest IXPDigital Realty GNV (8217 Linton Hall)
IXP distance32.1 mi
Fiber providers4
Fiber coverage39.4%
Nearest cloud providerAWS
Nearest cloud regionus-east-1
Cloud region distance36.7 mi

Site characteristics

Site typeGreenfield
Land contactWarren County Assessor
Land owner typeprivate
Buildability75.0/100
Land cover (NLCD)Pasture/Hay

Risk & environment

Environmental constraintLow (30/100)
Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteCREATIVE COATINGS INC
Hazard sub-score60/100
Construction cost index73.2 (avg 100)

Location context

Nearest datacenterMiddletown Data Center
DC distance9.1 mi
Nearest rail0.6 mi
Nearest gas pipeline4.9 mi
Nearest fiber route39.1 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.05¢/kWh
Industrial electricity7.55¢/kWh
Cooling degree days1,300
Heating degree days4,000
Land price / acre$8,337

Regulatory climate

Moderatestate posture · as of 2026-08

Largest US DC market; incentive preserved but a new $0.011/kWh DC electricity tax starts Jul 2026.

DC tax incentiveYes
Large-load threshold≥ 25 MW

Dominion GS-5 large-load rate (≥25 MW, ~$1.5M/MW collateral, 14-yr term) effective 2027.

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track OZ Warren

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
46
Fiber connectivity12%
60
Energy cost10%
83
Water risk7%
91
Natural hazard6%
60
Buildability7%
75
Labor market4%
50
DC cluster4%
90
Land / acreage3%
54
Construction cost3%
89
Gas pipeline2%
84
Tax incentive1%
100
Climate / cooling1%
60

Nearby comparable sites

Other scored datacenter candidate sites in Warren, ranked by DC Readiness.

Sites near OZ Warren
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN121555Substation-Adjacent500 kV1,000 MW3.8 yrs65.0
TAP140501Substation-Adjacent138 kV100 MW3.8 yrs56.6
UNKNOWN121558Substation-Adjacent138 kV100 MW3.8 yrs56.6
STRASBURGSubstation-Adjacent138 kV100 MW3.8 yrs56.6
JACKSON FURNITURE INDUSTRIES, INC. (UPHOLSTERED HOUSEHOLD FURNITURE MANUFACTURING)Manufacturing——3.5 yrs53.0
ESSROC CEMENT CORP. (ALL OTHER MISCELLANEOUS NONMETALLIC MINERAL PRODUCT MANUFACTURING)Manufacturing——3.5 yrs53.0
INTERBAKE FOODS, LLC (COMMERCIAL BAKERIES)Manufacturing——3.5 yrs53.0
NATIONAL MEDIA SERVICES, INC. (PRERECORDED COMPACT DISC (EXCEPT SOFTWARE), TAPE, AND RECORD REPRODUCING)Manufacturing——3.5 yrs53.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for OZ Warren, Warren. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.