WILLIAMS BROS. STRIKE FIRST, INC. (METAL WINDOW AND DOOR MANUFACTURING)

Manufacturing

Warren, Virginia

DC Readiness
50.8
Fair / 100

WILLIAMS BROS. STRIKE FIRST, INC. (METAL WINDOW AND DOOR MANUFACTURING) is a manufacturing datacenter candidate site in Warren, Virginia. It screens at 50.8/100 DC Readiness.

Power & interconnection

Speed to power

Connectivity

Nearest IXPDigital Realty GNV (8217 Linton Hall)
IXP distance32.0 mi

Site characteristics

Site typeManufacturing

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score70/100

Location context

Nearest datacenterMiddletown Data Center
DC distance9.2 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.05¢/kWh
Industrial electricity7.55¢/kWh
Cooling degree days1,300
Heating degree days4,000
Land price / acre$8,337

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
54
Fiber connectivity12%
34
Energy cost10%
50
Water risk8%
88
Natural hazard8%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
46
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
60

Nearby comparable sites

Other scored datacenter candidate sites in Warren, ranked by DC Readiness.

Sites near WILLIAMS BROS. STRIKE FIRST, INC. (METAL WINDOW AND DOOR MANUFACTURING)
SiteTypeVoltageCapacityQueue waitScore
FRONT ROYALSubstation-Adjacent500 kV1,000 MW3.0 yrs78.2
UNKNOWN121555Substation-Adjacent500 kV1,000 MW3.0 yrs75.9
UNKNOWN121558Substation-Adjacent138 kV100 MW3.0 yrs69.7
Greenfield (MOSBY - MEADOW BROOK)Greenfield500 kV1,000 MW3.0 yrs69.2
STRASBURGSubstation-Adjacent138 kV100 MW3.0 yrs69.1
Greenfield (UNKNOWN121555 - MORRISVILLE)Greenfield500 kV1,000 MW3.0 yrs67.8
RIVERTONSubstation-Adjacent138 kV100 MW3.0 yrs67.0
TAP140501Substation-Adjacent138 kV100 MW3.0 yrs64.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WILLIAMS BROS. STRIKE FIRST, INC. (METAL WINDOW AND DOOR MANUFACTURING), Warren. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.