Datacenter Sites in Botetourt, Virginia

Botetourt has 55 scored datacenter candidate sites averaging 54.1/100 DC Readiness, with a catalogued aggregate of 5,700 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

55
Candidate sites
54.1/100
Avg DC Readiness
5,700 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Botetourt

Site-selection context for Botetourt

Yessales_tax_exemption
Datacenter tax incentive
6.95¢/kWh
Commercial electricity
5.05¢/kWh
Industrial electricity
6
Fiber providers
Low
Water stress
$5,457
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

By site type

Top datacenter sites in Botetourt

Top datacenter sites in Botetourt
SiteTypeVoltageCapacityQueue waitScore
Greenfield (LEXINGTON - CLOVERDALE EAST)Greenfield500 kV1,000 MW2.8 yrs58.3
O-N MINERALS, JAMES RIVER OPERATION (CUT STONE AND STONE PRODUCT MANUFACTURING)Manufacturing3.5 yrs54.2
MTI GROENDYK, INC. (RUBBER PRODUCT MANUFACTURING FOR MECHANICAL USE)Manufacturing3.5 yrs54.2
ALTEC INDUSTRIES, INC. (NOT AVAILABLE)Manufacturing3.5 yrs53.4
ROANOKE CEMENT CO., INC. (CEMENT MANUFACTURING)Manufacturing3.5 yrs53.4
O'NEAL STEEL, INC. (PLATE WORK MANUFACTURING)Manufacturing3.5 yrs53.4
KOYO STEERING SYSTEMS OF U. S. A. (NOT AVAILABLE)Manufacturing3.5 yrs53.4
UNKNOWN121374Substation-Adjacent138 kV100 MW3.8 yrs53.4
D & E ACQUISITIONS, INC. (ORNAMENTAL AND ARCHITECTURAL METAL WORK MANUFACTURING)Manufacturing3.5 yrs53.4
MURRAY CIDER CO., INC. (FLAVORING SYRUP AND CONCENTRATE MANUFACTURING)Manufacturing3.5 yrs53.4
DYNAX AMERICA CORP. (ALL OTHER MOTOR VEHICLE PARTS MANUFACTURING)Manufacturing3.5 yrs53.3
SEMATCO, INC. (MACHINE SHOPS)Manufacturing3.5 yrs53.3
JOHNSON CONTROLS, INC. (AIR AND GAS COMPRESSOR MANUFACTURING)Manufacturing3.5 yrs53.3
VIRGINIA FORGE CO. (ALL OTHER MOTOR VEHICLE PARTS MANUFACTURING)Manufacturing3.5 yrs53.3
ARKAY PACKAGING CORP. (FOLDING PAPERBOARD BOX MANUFACTURING)Manufacturing3.5 yrs53.3
TREAD CORP. (NOT AVAILABLE)Manufacturing3.5 yrs53.3
ARCHITECTURAL CONCRETE PRODUCTS, INC. (NOT AVAILABLE)Manufacturing3.5 yrs53.3
LAWRENCE TRANSPORTATION SYSTEMS (NOT AVAILABLE)Manufacturing3.5 yrs53.3
PEPSI BOTTLING GROUP, INC., THE (FLAVORING SYRUP AND CONCENTRATE MANUFACTURING)Manufacturing3.5 yrs53.3
METALSA ROANOKE, INC. (MOTOR VEHICLE BODY MANUFACTURING)Manufacturing3.5 yrs53.3
RUSCO WINDOW CO. (METAL WINDOW AND DOOR MANUFACTURING)Manufacturing3.5 yrs53.3
CAPCO MACHINERY SYSTEMS (MACHINE TOOL (METAL CUTTING TYPES) MANUFACTURING)Manufacturing3.5 yrs53.3
GENERAL SHALE BRICK, INC. (BRICK AND STRUCTURAL CLAY TILE MANUFACTURING)Manufacturing3.5 yrs53.3
GALA INDUSTRIES, INC. (INDUSTRIAL PROCESS FURNACE AND OVEN MANUFACTURING)Manufacturing3.5 yrs53.1
CARRIS REELS, INC. (ALL OTHER PLASTICS PRODUCT MANUFACTURING)Manufacturing3.5 yrs53.0

Botetourt datacenter FAQ

How many datacenter sites are in Botetourt?
55 scored datacenter candidate sites, averaging 54.1/100 DC Readiness.
Does Botetourt offer datacenter tax incentives?
Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
What is the natural-hazard risk in Botetourt?
FEMA's National Risk Index rates Botetourt as "Relatively Moderate" (score 30).
What are industrial electricity rates in Botetourt?
Average industrial electricity is 5.05¢/kWh and commercial is 6.95¢/kWh in Botetourt.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Botetourt, Virginia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.