Skip to content
Gridcensus

MTI GROENDYK, INC. (RUBBER PRODUCT MANUFACTURING FOR MECHANICAL USE)

Manufacturing

Botetourt, Virginia

DC Readiness
53.2
Fair / 100

MTI GROENDYK, INC. (RUBBER PRODUCT MANUFACTURING FOR MECHANICAL USE) is a manufacturing datacenter candidate site in Botetourt, Virginia. It screens at 53.2/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

UtilityVIRGINIA ELECTRIC & POWER COinvestor ownedmoderate to large load · terms ≥ 25 MWSchedule GS-5 (large general service, ≥25 MW) · 85% min take · 14 yr

Speed to power

Interconnection outlookModerate
≈ 3.5 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

Avg queue wait3.5 yrs

Connectivity

Nearest IXPEquinix CU1/CU2/CU3/CU4 - Culpeper
IXP distance113.0 mi
Fiber providers6
Fiber coverage68.0%

Site characteristics

Site typeManufacturing

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score70/100

Location context

Nearest datacenterLumos Networks
DC distance30.6 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity6.95¢/kWh
Industrial electricity5.05¢/kWh
Cooling degree days1,300
Heating degree days4,000
Land price / acre$5,457

Regulatory climate

Moderatestate posture · as of 2026-08

Largest US DC market; incentive preserved but a new $0.011/kWh DC electricity tax starts Jul 2026.

DC tax incentiveYes
Large-load threshold≥ 25 MW

Dominion GS-5 large-load rate (≥25 MW, ~$1.5M/MW collateral, 14-yr term) effective 2027.

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track MTI GROENDYK, INC. (RUBBER PRODUCT MANUFACTURING FOR MECHANICAL USE)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
55
Fiber connectivity12%
69
Energy cost10%
50
Water risk7%
88
Natural hazard6%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
46
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
60

Nearby comparable sites

Other scored datacenter candidate sites in Botetourt, ranked by DC Readiness.

Sites near MTI GROENDYK, INC. (RUBBER PRODUCT MANUFACTURING FOR MECHANICAL USE)
SiteTypeVoltageCapacityQueue waitScore
Greenfield (LEXINGTON - CLOVERDALE EAST)Greenfield500 kV1,000 MW2.8 yrs59.2
UNKNOWN121374Substation-Adjacent138 kV100 MW3.8 yrs56.0
UNKNOWN114183Substation-Adjacent115 kV100 MW3.8 yrs55.6
O-N MINERALS, JAMES RIVER OPERATION (CUT STONE AND STONE PRODUCT MANUFACTURING)Manufacturing——3.5 yrs53.2
DYNAX AMERICA CORP. (ALL OTHER MOTOR VEHICLE PARTS MANUFACTURING)Manufacturing——3.5 yrs52.4
PEPSI BOTTLING GROUP, INC., THE (FLAVORING SYRUP AND CONCENTRATE MANUFACTURING)Manufacturing——3.5 yrs52.4
ROANOKE CEMENT CO., INC. (CEMENT MANUFACTURING)Manufacturing——3.5 yrs52.4
TREAD CORP. (NOT AVAILABLE)Manufacturing——3.5 yrs52.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MTI GROENDYK, INC. (RUBBER PRODUCT MANUFACTURING FOR MECHANICAL USE), Botetourt. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.