2801 Lee Hwy

Shovel-Ready

Botetourt, Virginia · PJM

DC Readiness
50.5
Fair / 100

At a glance

2801 Lee Hwy is a shovel-ready datacenter candidate site in Botetourt, Virginia, scoring 50.5/100 DC Readiness — 9th of 50 scored sites in the county. It sits in the PJM grid region and the CRAIG-BOTETOURT ELECTRIC COOP service territory, where interconnection has averaged 5.1 years from request to operation.

Power & interconnection

UtilityCRAIG-BOTETOURT ELECTRIC COOPnot available

Speed to power

Interconnection outlookConstrained
≈ 6.0 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionPJM
Queue depth907
Avg queue wait5.1 yrs
Recent queue wait6.0 yrs
Completion rate20%
Withdrawal rate80%

Connectivity

Nearest IXPCyrusOne NC-1
IXP distance115.2 mi
Fiber providers6
Fiber coverage68.0%

Site characteristics

Site typeShovel-Ready
Land contactBotetourt County Assessor

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score70/100

Location context

Nearest datacenterLumos Networks
DC distance41.8 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity6.95¢/kWh
Industrial electricity5.05¢/kWh
Cooling degree days1,300
Heating degree days4,000
Land price / acre$5,457

Regulatory climate

Moderatestate posture · as of 2026-08

Largest US DC market; incentive preserved but a new $0.011/kWh DC electricity tax starts Jul 2026.

DC tax incentiveYes
Large-load threshold≥ 25 MW

Dominion GS-5 large-load rate (≥25 MW, ~$1.5M/MW collateral, 14-yr term) effective 2027.

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track 2801 Lee Hwy

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does 2801 Lee Hwy compare with other sites in Botetourt?

2801 Lee Hwy ranks 9th of 50 scored candidate sites in Botetourt. Its 50.5/100 is roughly in line with the county average of 50.8. It is roughly in line with the Virginia average of 52.6 and roughly in line with the national average of 53.2.

Against the Virginia average, its strongest sub-score is natural hazard (70 vs 69) and its weakest is power availability (30 vs 35). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is 2801 Lee Hwy to power, fiber and other datacenters?

The nearest located transmission bottleneck is MTAIRYTP-RENAN 35E2 B 69 KV (PJM), 43 miles away. For connectivity, the nearest internet exchange facility is CyrusOne NC-1 at 115.2 miles. 6 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Lumos Networks, 41.8 miles away.

What are the flood, water and hazard risks at 2801 Lee Hwy?

At the county level, FEMA's National Risk Index rates Botetourt "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
45
Fiber connectivity12%
69
Energy cost10%
50
Water risk7%
88
Natural hazard6%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
46
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
60

Nearby comparable sites

Other scored datacenter candidate sites in Botetourt, ranked by DC Readiness.

Sites near 2801 Lee Hwy
SiteTypeVoltageCapacityQueue waitScore
Greenfield (LEXINGTON - CLOVERDALE EAST)Greenfield500 kV1,000 MW4.7 yrs57.5
UNKNOWN121374Substation-Adjacent138 kV100 MW5.1 yrs56.8
UNKNOWN114183Substation-Adjacent115 kV100 MW5.1 yrs56.4
Mine SiteFormer Mine——5.1 yrs51.3
O-N MINERALS, JAMES RIVER OPERATION (CUT STONE AND STONE PRODUCT MANUFACTURING)Manufacturing——5.1 yrs51.3
MTI GROENDYK, INC. (RUBBER PRODUCT MANUFACTURING FOR MECHANICAL USE)Manufacturing——5.1 yrs51.3
Glade Creek PropertyShovel-Ready——5.1 yrs50.8
621 Frontage Rd. SiteShovel-Ready——5.1 yrs50.8

2801 Lee Hwy: common questions

What is the DC Readiness score of 2801 Lee Hwy?

2801 Lee Hwy scores 50.5/100 on the GridCensus DC Readiness scale, rated fair. It ranks 9th of 50 scored sites in Botetourt. The Botetourt average is 50.8 and the Virginia average is 52.6.

Which electric utility serves 2801 Lee Hwy?

CRAIG-BOTETOURT ELECTRIC COOP (not available) holds the retail service territory that contains the site.

What grid region is 2801 Lee Hwy in?

2801 Lee Hwy is in the PJM region. Projects interconnecting there have averaged a 5.1-year wait from queue request to operation.

How far is 2801 Lee Hwy from an internet exchange?

The nearest internet exchange facility is CyrusOne NC-1, about 115.2 miles away; 6 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “2801 Lee Hwy, Botetourt, VA”, https://gridcensus.com/datacenter-sites/virginia/botetourt/2801-lee-hwy-9be743b0 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for 2801 Lee Hwy, Botetourt is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.