Skip to content
Gridcensus

Datacenter Sites in Macon, Missouri

Macon has 43 scored datacenter candidate sites averaging 56.4/100 DC Readiness, with a catalogued aggregate of 504 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

43
Candidate sites
56.4/100
Avg DC Readiness
504 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Macon

Site-selection context for Macon

Yessales_tax_exemption
Datacenter tax incentive
12.45¢/kWh
Commercial electricity
7.23¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$4,026
Land price / acre
1,500
Cooling degree days
4,700
Heating degree days
56°F
Mean annual temp

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

By site type

Top datacenter sites in Macon

Top datacenter sites in Macon
SiteTypeVoltageCapacityQueue waitScore
EC Near La PlataGreenfield——1.4 yrs61.4
EC Near Sub 2 Generating StationGreenfield——1.4 yrs60.9
EC Near MaconGreenfield——1.4 yrs59.5
EC Near La PlataGreenfield——1.4 yrs59.5
EC Near MaconGreenfield——1.4 yrs59.2
EC Near La PlataGreenfield——1.4 yrs59.1
EC Near Sub 2 Generating StationGreenfield——1.4 yrs59.0
EC Near La PlataGreenfield——1.4 yrs58.9
EC Near La PlataGreenfield——1.4 yrs58.5
EC Near MaconGreenfield——1.4 yrs58.5
EC Near Sub 2 Generating StationGreenfield——1.4 yrs58.5
EC Near La PlataGreenfield——1.4 yrs58.4
EC Near MaconGreenfield——1.4 yrs58.4
EC Near Sub 2 Generating StationGreenfield——1.4 yrs58.2
EC Near La PlataGreenfield——1.4 yrs58.1
EC Near MaconGreenfield——1.4 yrs57.7
EC Near La PlataGreenfield——1.4 yrs57.7
EC Near La PlataGreenfield——1.4 yrs57.7
EC Near Sub 2 Generating StationGreenfield——1.4 yrs57.6
EC Near La PlataGreenfield——1.4 yrs57.6
EC Near MaconGreenfield——1.4 yrs57.6
EC Near La PlataGreenfield——1.4 yrs57.5
EC Near La PlataGreenfield——1.4 yrs57.2
EC Near Sub 2 Generating StationGreenfield——1.4 yrs57.1
EC Near MaconGreenfield——1.4 yrs56.9

Macon datacenter FAQ

How many datacenter sites are in Macon?
43 scored datacenter candidate sites, averaging 56.4/100 DC Readiness.
Does Macon offer datacenter tax incentives?
Qualified data center sales tax exemption (2019 law); state income tax credits.
What is the natural-hazard risk in Macon?
FEMA's National Risk Index rates Macon as "Relatively High" (score 38).
What are industrial electricity rates in Macon?
Average industrial electricity is 7.23¢/kWh and commercial is 12.45¢/kWh in Macon.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Macon, Missouri. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.