Skip to content
Gridcensus

Datacenter Sites in Greene County, Missouri

Greene County has 273 scored datacenter candidate sites averaging 57.8/100 DC Readiness, with a catalogued aggregate of 3,200 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

At a glance

Greene County, Missouri has 273 scored datacenter candidate sites averaging 57.8/100 DC Readiness, roughly in line with the Missouri average of 55.7. It ranks 4th of 110 Missouri counties by number of sites and 13th by average score. The top-scoring site is BROOKLINE at 68.4/100.

273
Candidate sites
57.8/100
Avg DC Readiness
3,200 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Greene County

Site-selection context for Greene County

Yessales_tax_exemption
Datacenter tax incentive
10.73¢/kWh
Commercial electricity
8.64¢/kWh
Industrial electricity
9
Fiber providers
Low
Water stress
$7,004
Land price / acre
1,500
Cooling degree days
4,700
Heating degree days
56°F
Mean annual temp

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

How does Greene County compare with other counties in Missouri?

By number of scored sites, Greene County ranks 4th of the 110 Missouri counties with a county page, holding 8.0% of the state's 3,413 sites. Its average DC Readiness of 57.8/100 ranks 13th in the state and is roughly in line with the national average of 53.0. Nationally it has the 57th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 273 score 55 or higher.

What types of datacenter sites are in Greene County?

Industrial sites are the most common (213, 78% of the county's inventory), followed by substation-adjacent (35) and greenfield (14). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Greene County?

Industrial electricity averages 8.64¢/kWh and commercial 10.73¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (38). WRI water stress is low. 9 fiber providers report service in the county. The climate runs 1,500 cooling degree days a year with a mean temperature of 56°F. Land is valued around $7,004 an acre.

By site type

Top datacenter sites in Greene County

Top datacenter sites in Greene County
SiteTypeVoltageCapacityQueue waitScore
BROOKLINESubstation-Adjacent345 kV600 MW4.3 yrs68.4
OZ GreeneGreenfield——4.3 yrs67.2
OZ GreeneGreenfield——4.3 yrs66.2
EC Coal Greene CountyGreenfield——4.3 yrs65.6
EC Near James River Power StationGreenfield——3.9 yrs65.4
EC Near Main Street (MO)Greenfield——4.3 yrs65.4
EC Near Main Street (MO)Greenfield——4.3 yrs65.3
UNKNOWN117555Substation-Adjacent161 kV100 MW3.9 yrs64.8
UNKNOWN117559Substation-Adjacent161 kV100 MW4.3 yrs64.6
EC Near James River Power StationGreenfield——3.9 yrs64.4
EC Near Main Street (MO)Greenfield——3.9 yrs64.3
EC Near James River Power StationGreenfield——3.9 yrs63.9
WEST BELTSubstation-Adjacent161 kV100 MW4.3 yrs63.5
UNKNOWN117586Substation-Adjacent161 kV100 MW4.3 yrs63.5
UNKNOWN122479Substation-Adjacent161 kV100 MW3.9 yrs63.5
UNKNOWN117435Substation-Adjacent161 kV100 MW4.3 yrs63.4
UNKNOWN117663Substation-Adjacent161 kV100 MW3.9 yrs63.4
NICHOLSSubstation-Adjacent161 kV100 MW4.3 yrs63.3
TAP153761Substation-Adjacent161 kV100 MW4.3 yrs63.2
EC Near Main Street (MO)Greenfield——3.9 yrs63.2
UNKNOWN117162Substation-Adjacent161 kV100 MW4.3 yrs63.1
TAP153757Substation-Adjacent161 kV100 MW3.9 yrs63.1
TAP153760Substation-Adjacent161 kV100 MW4.3 yrs63.1
UNKNOWN117397Substation-Adjacent161 kV100 MW4.3 yrs63.1
UNKNOWN117458Substation-Adjacent161 kV100 MW3.9 yrs63.0

Every scored site in Greene County

All 273 sites, best first.

Greene County datacenter FAQ

How many datacenter sites are in Greene County?

273 scored datacenter candidate sites, averaging 57.8/100 DC Readiness. That is the 4th-most of 110 Missouri counties with five or more sites.

What is the highest-scoring datacenter site in Greene County?

BROOKLINE scores 68.4/100 DC Readiness, the highest of the 273 scored sites in Greene County (a substation-adjacent site).

Does Greene County offer datacenter tax incentives?

Qualified data center sales tax exemption (2019 law); state income tax credits.

What is the natural-hazard risk in Greene County?

FEMA's National Risk Index rates Greene County as "Relatively High" (score 38).

What are industrial electricity rates in Greene County?

Average industrial electricity is 8.64¢/kWh and commercial is 10.73¢/kWh in Greene County.

More in Missouri

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Greene County, Missouri”, https://gridcensus.com/datacenter-sites/missouri/greene-county (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Greene County, Missouri is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.