SPRINGFIELD USMCFP

Federal Excess

Greene County, Missouri · PJM

DC Readiness
47.8
Fair / 100

SPRINGFIELD USMCFP is a federal excess datacenter candidate site in Greene County, Missouri, interconnecting through PJM. It screens at 47.8/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionPJM
Queue depth11

Connectivity

Nearest IXPBluebird Underground Data Center
IXP distance7.2 mi

Site characteristics

Acreage257 ac
Former useInstitutional

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterBluebird Underground Data Center
DC distance7.2 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.73¢/kWh
Industrial electricity8.64¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$7,004

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
47
Fiber connectivity12%
73
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
58
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Greene County, ranked by DC Readiness.

Sites near SPRINGFIELD USMCFP
SiteTypeVoltageCapacityQueue waitScore
BROOKLINESubstation-Adjacent345 kV600 MW3.4 yrs78.6
BROOKLINESubstation-Adjacent345 kV600 MW1.4 yrs75.3
UNKNOWN117559Substation-Adjacent161 kV100 MW1.4 yrs71.9
TAP153759Substation-Adjacent161 kV100 MW1.4 yrs71.5
UNKNOWN117682Substation-Adjacent161 kV100 MW1.4 yrs71.4
UNKNOWN117398Substation-Adjacent161 kV100 MW1.4 yrs71.4
TAP153762Substation-Adjacent161 kV100 MW1.4 yrs71.3
NICHOLSSubstation-Adjacent161 kV100 MW1.4 yrs71.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for SPRINGFIELD USMCFP, Greene County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.