Henry has 60 scored datacenter candidate sites averaging 54.6/100 DC Readiness, with a catalogued aggregate of 1,200 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

At a glance

Henry, Missouri has 60 scored datacenter candidate sites averaging 54.6/100 DC Readiness, roughly in line with the Missouri average of 55.7. It ranks 5th of 110 Missouri counties by number of sites and 51st by average score. The top-scoring site is Substation-Adjacent site · 5fdab394 at 62.7/100.

60
Candidate sites
54.6/100
Avg DC Readiness
1,200 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Henry

Site-selection context for Henry

Yessales_tax_exemption
Datacenter tax incentive
10.72¢/kWh
Commercial electricity
7.00¢/kWh
Industrial electricity
6
Fiber providers
Low
Water stress
$4,028
Land price / acre
1,500
Cooling degree days
4,700
Heating degree days
56°F
Mean annual temp

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

How does Henry compare with other counties in Missouri?

By number of scored sites, Henry ranks 5th of the 110 Missouri counties with a county page, holding 1.8% of the state's 3,413 sites. Its average DC Readiness of 54.6/100 ranks 51st in the state and is roughly in line with the national average of 53.0. Nationally it has the 623rd-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 22 score 55 or higher.

What types of datacenter sites are in Henry?

Industrial sites are the most common (29, 48% of the county's inventory), followed by greenfield (18) and substation-adjacent (8). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Henry?

Industrial electricity averages 7.00¢/kWh and commercial 10.72¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (38). WRI water stress is low. 6 fiber providers report service in the county. The climate runs 1,500 cooling degree days a year with a mean temperature of 56°F. Land is valued around $4,028 an acre.

By site type

Top datacenter sites in Henry

Top datacenter sites in Henry
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN117112Substation-Adjacent161 kV100 MW4.3 yrs62.7
EC Coal Henry CountyGreenfield——4.3 yrs62.1
EC Near MontroseGreenfield——4.3 yrs61.7
EC Near MontroseGreenfield——4.3 yrs60.0
EC Near MontroseGreenfield——4.3 yrs59.6
EC Near MontroseGreenfield——4.3 yrs59.5
EC Near MontroseGreenfield——4.3 yrs59.3
UNKNOWN117439Substation-Adjacent161 kV100 MW4.3 yrs59.1
UNKNOWN121361Substation-Adjacent161 kV100 MW4.3 yrs59.1
UNKNOWN121416Substation-Adjacent161 kV100 MW4.3 yrs59.1
EC Coal Henry CountyGreenfield——4.3 yrs59.1
UNKNOWN121359Substation-Adjacent161 kV100 MW4.3 yrs59.0
UNKNOWN117542Substation-Adjacent161 kV100 MW4.3 yrs58.9
UNKNOWN121358Substation-Adjacent161 kV100 MW4.3 yrs58.9
EC Coal Henry CountyGreenfield——4.3 yrs58.8
UNKNOWN117696Substation-Adjacent161 kV100 MW4.3 yrs58.3
EC Near MontroseGreenfield——4.3 yrs58.0
EC Near MontroseGreenfield——4.3 yrs57.9
EC Near MontroseGreenfield——4.3 yrs57.4
EC Coal Henry CountyGreenfield——4.3 yrs56.9
EC Near MontroseGreenfield——4.3 yrs56.7
EC Near MontroseGreenfield——4.3 yrs56.7
Greenfield (UNKNOWN121359 - TAP138907)Greenfield161 kV100 MW4.3 yrs52.7
Greenfield (UNKNOWN117384 - UNKNOWN121361)Greenfield161 kV100 MW4.3 yrs52.5
Mainstreet Office Building 2Industrial——4.3 yrs52.4

Every scored site in Henry

All 60 sites, best first.

Henry datacenter FAQ

How many datacenter sites are in Henry?

60 scored datacenter candidate sites, averaging 54.6/100 DC Readiness. That is the 5th-most of 110 Missouri counties with five or more sites.

What is the highest-scoring datacenter site in Henry?

Substation-Adjacent site · 5fdab394 scores 62.7/100 DC Readiness, the highest of the 60 scored sites in Henry (a substation-adjacent site).

Does Henry offer datacenter tax incentives?

Qualified data center sales tax exemption (2019 law); state income tax credits.

What is the natural-hazard risk in Henry?

FEMA's National Risk Index rates Henry as "Relatively High" (score 38).

What are industrial electricity rates in Henry?

Average industrial electricity is 7.00¢/kWh and commercial is 10.72¢/kWh in Henry.

More in Missouri

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Henry, Missouri”, https://gridcensus.com/datacenter-sites/missouri/henry (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Henry, Missouri is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.