Greenfield (UNKNOWN117384 - UNKNOWN121361)

Greenfield

Henry, Missouri · MISO

DC Readiness
50.4
Fair / 100

Greenfield (UNKNOWN117384 - UNKNOWN121361) is a greenfield datacenter candidate site in Henry, Missouri, interconnecting through MISO. It screens at 50.4/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN117384
Substation voltage161 kV
Available capacity100 MW
UtilityEVERGY MISSOURI WESTinvestor ownedfavorable to large load · terms ≥ 75 MWLarge Load Power Service (LLPS, ≥75 MW) · 80% min take · 12 yr

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth52
Avg queue wait2.8 yrs

Connectivity

Nearest IXPIron Mountain Data Center - Kansas City (KCM-1)
IXP distance56.8 mi
Fiber providers6
Fiber coverage77.7%

Site characteristics

Site typeGreenfield

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score62/100

Location context

Nearest datacenterIron Mountain Data Center - Kansas City (KCM-1)
DC distance56.8 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.72¢/kWh
Industrial electricity7.00¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$4,028

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Greenfield (UNKNOWN117384 - UNKNOWN121361)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
32
Speed to power20%
45
Fiber connectivity12%
69
Energy cost10%
50
Water risk7%
88
Natural hazard6%
62
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
50

Nearby comparable sites

Other scored datacenter candidate sites in Henry, ranked by DC Readiness.

Sites near Greenfield (UNKNOWN117384 - UNKNOWN121361)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN117112Substation-Adjacent161 kV100 MW2.8 yrs61.4
EC Coal Henry CountyGreenfield——1.4 yrs61.3
EC Near MontroseGreenfield——1.4 yrs60.8
EC Near MontroseGreenfield——1.4 yrs59.1
EC Near MontroseGreenfield——1.4 yrs58.7
EC Near MontroseGreenfield——1.4 yrs58.7
EC Near MontroseGreenfield——1.4 yrs58.4
EC Coal Henry CountyGreenfield——1.4 yrs58.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (UNKNOWN117384 - UNKNOWN121361), Henry. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.