Datacenter Sites in Jasper County, Missouri

Jasper County has 50 scored datacenter candidate sites averaging 55.4/100 DC Readiness, with a catalogued aggregate of 3,252 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

At a glance

Jasper County, Missouri has 50 scored datacenter candidate sites averaging 55.4/100 DC Readiness, roughly in line with the Missouri average of 55.7. It ranks 6th of 110 Missouri counties by number of sites and 36th by average score. The top-scoring site is Substation-Adjacent site · 44bf6c0e at 63.3/100.

50
Candidate sites
55.4/100
Avg DC Readiness
3,252 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Jasper County

Site-selection context for Jasper County

Yessales_tax_exemption
Datacenter tax incentive
12.52¢/kWh
Commercial electricity
9.09¢/kWh
Industrial electricity
7
Fiber providers
Low
Water stress
$4,178
Land price / acre
1,500
Cooling degree days
4,700
Heating degree days
56°F
Mean annual temp

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

How does Jasper County compare with other counties in Missouri?

By number of scored sites, Jasper County ranks 6th of the 110 Missouri counties with a county page, holding 1.5% of the state's 3,413 sites. Its average DC Readiness of 55.4/100 ranks 36th in the state and is roughly in line with the national average of 53.0. Nationally it has the 757th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 33 score 55 or higher.

What types of datacenter sites are in Jasper County?

Greenfield sites are the most common (19, 38% of the county's inventory), followed by substation-adjacent (16) and industrial (8). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Jasper County?

Industrial electricity averages 9.09¢/kWh and commercial 12.52¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (38). WRI water stress is low. 7 fiber providers report service in the county. The climate runs 1,500 cooling degree days a year with a mean temperature of 56°F. Land is valued around $4,178 an acre.

By site type

Top datacenter sites in Jasper County

Top datacenter sites in Jasper County
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN173548Substation-Adjacent345 kV600 MW3.9 yrs63.3
Oronogo-Duenweg Mining Belt Superfund Solar SiteBrownfield—2 MW3.9 yrs61.1
OZ JasperGreenfield——3.9 yrs59.8
EC Near AsburyGreenfield——3.9 yrs59.3
EC Coal Jasper CountyGreenfield——3.9 yrs58.5
EC Near AsburyGreenfield——4.3 yrs58.2
EC Near AsburyGreenfield——4.3 yrs58.2
EC Near AsburyGreenfield——3.9 yrs58.1
UNKNOWN117520Substation-Adjacent161 kV100 MW3.9 yrs58.0
UNKNOWN117427Substation-Adjacent161 kV100 MW3.9 yrs57.9
UNKNOWN122828Substation-Adjacent161 kV100 MW4.3 yrs57.7
EC Near AsburyGreenfield——3.9 yrs57.6
UNKNOWN117137Substation-Adjacent161 kV100 MW4.3 yrs57.6
UNKNOWN122829Substation-Adjacent161 kV100 MW4.3 yrs57.6
EC Near AsburyGreenfield——3.9 yrs57.6
EC Near AsburyGreenfield——3.9 yrs57.6
EC Coal Jasper CountyGreenfield——3.9 yrs57.5
EC Near AsburyGreenfield——4.3 yrs57.3
UNKNOWN117512Substation-Adjacent161 kV100 MW3.9 yrs57.2
UNKNOWN117513Substation-Adjacent161 kV100 MW3.9 yrs57.2
UNKNOWN121817Substation-Adjacent161 kV100 MW3.9 yrs57.2
UNKNOWN121790Substation-Adjacent161 kV100 MW3.9 yrs57.1
UNKNOWN121816Substation-Adjacent161 kV100 MW3.9 yrs57.1
UNKNOWN121820Substation-Adjacent161 kV100 MW3.9 yrs57.1
UNKNOWN121818Substation-Adjacent161 kV100 MW3.9 yrs57.1

Every scored site in Jasper County

All 50 sites, best first.

Jasper County datacenter FAQ

How many datacenter sites are in Jasper County?

50 scored datacenter candidate sites, averaging 55.4/100 DC Readiness. That is the 6th-most of 110 Missouri counties with five or more sites.

What is the highest-scoring datacenter site in Jasper County?

Substation-Adjacent site · 44bf6c0e scores 63.3/100 DC Readiness, the highest of the 50 scored sites in Jasper County (a substation-adjacent site).

Does Jasper County offer datacenter tax incentives?

Qualified data center sales tax exemption (2019 law); state income tax credits.

What is the natural-hazard risk in Jasper County?

FEMA's National Risk Index rates Jasper County as "Relatively High" (score 38).

What are industrial electricity rates in Jasper County?

Average industrial electricity is 9.09¢/kWh and commercial is 12.52¢/kWh in Jasper County.

More in Missouri

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 13, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Jasper County, Missouri”, https://gridcensus.com/datacenter-sites/missouri/jasper-county (data as of November 13, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Jasper County, Missouri is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.