UNKNOWN121819

Substation-Adjacent

Jasper County, Missouri · SERC

DC Readiness
57.0
Good / 100

UNKNOWN121819 is a substation-adjacent datacenter candidate site in Jasper County, Missouri, interconnecting through SERC. It screens at 57.0/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN121819
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
UtilityBARTON COUNTY ELEC COOP, INCnot available

Speed to power

Interconnection outlookModerate
≈ 4.7 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSERC
Queue depth52
Avg queue wait3.9 yrs
Recent queue wait4.7 yrs
Completion rate15%
Withdrawal rate85%

Connectivity

Nearest IXPBluebird Underground Data Center
IXP distance73.2 mi
Fiber providers7
Fiber coverage31.9%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score62/100

Location context

Nearest datacenterBluebird Underground Data Center
DC distance73.2 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.52¢/kWh
Industrial electricity9.09¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$4,178

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN121819

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power20%
58
Fiber connectivity12%
58
Energy cost10%
50
Water risk7%
88
Natural hazard6%
62
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
50

Nearby comparable sites

Other scored datacenter candidate sites in Jasper County, ranked by DC Readiness.

Sites near UNKNOWN121819
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN173548Substation-Adjacent345 kV600 MW3.9 yrs63.3
Oronogo-Duenweg Mining Belt Superfund Solar SiteBrownfield—2 MW3.9 yrs61.1
OZ JasperGreenfield——3.9 yrs59.8
EC Near AsburyGreenfield——3.9 yrs59.3
EC Coal Jasper CountyGreenfield——3.9 yrs58.5
EC Near AsburyGreenfield——4.3 yrs58.2
EC Near AsburyGreenfield——4.3 yrs58.2
EC Near AsburyGreenfield——3.9 yrs58.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for UNKNOWN121819, Jasper County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.