Gerhart Industrial Park

Industrial

Henry, Missouri · SPP

DC Readiness
52.3
Fair / 100

Gerhart Industrial Park is an industrial datacenter candidate site in Henry, Missouri, interconnecting through SPP. It screens at 52.3/100 DC Readiness and a 4.3 yrs average interconnection-queue wait.

Power & interconnection

UtilityEVERGY MISSOURI WESTinvestor ownedfavorable to large load · terms ≥ 75 MWLarge Load Power Service (LLPS, ≥75 MW) · 80% min take · 12 yr

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth33
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Nearest IXPIron Mountain Data Center - Kansas City (KCM-1)
IXP distance57.6 mi
Fiber providers6
Fiber coverage77.7%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score62/100

Location context

Nearest datacenterIron Mountain Data Center - Kansas City (KCM-1)
DC distance57.6 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.72¢/kWh
Industrial electricity7.00¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$4,028

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Gerhart Industrial Park

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
56
Fiber connectivity12%
71
Energy cost10%
50
Water risk7%
88
Natural hazard6%
62
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
50

Nearby comparable sites

Other scored datacenter candidate sites in Henry, ranked by DC Readiness.

Sites near Gerhart Industrial Park
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN117112Substation-Adjacent161 kV100 MW4.3 yrs62.7
EC Coal Henry CountyGreenfield——4.3 yrs62.1
EC Near MontroseGreenfield——4.3 yrs61.7
EC Near MontroseGreenfield——4.3 yrs60.0
EC Near MontroseGreenfield——4.3 yrs59.6
EC Near MontroseGreenfield——4.3 yrs59.5
EC Near MontroseGreenfield——4.3 yrs59.3
UNKNOWN121416Substation-Adjacent161 kV100 MW4.3 yrs59.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Gerhart Industrial Park, Henry is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.