Skip to content
Gridcensus

Substation-Adjacent site at 39.787, -92.780

Substation-Adjacent

Macon, Missouri · MISO

DC Readiness
56.0
Good / 100

At a glance

Substation-Adjacent site at 39.787, -92.780 is a substation-adjacent datacenter candidate site in Macon, Missouri, scoring 56.0/100 DC Readiness — 27th of 43 scored sites in the county. Its nearest substation is UNKNOWN117575 (0 mi, 69 kV). It sits in the MISO grid region and the UNION ELECTRIC CO - (MO) service territory, where interconnection has averaged 4.3 years from request to operation. GridCensus catalogs 50 MW of candidate capacity here.

Power & interconnection

Nearest substationUNKNOWN117575
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityUNION ELECTRIC CO - (MO)investor ownedmoderate to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionMISO
Queue depth52
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPLightEdge Kansas City Subtropolis (KCI1)
IXP distance100.1 mi
Fiber providers5
Fiber coverage94.3%

Site characteristics

Land contactMacon County County Assessor

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score62/100

Location context

Nearest datacenterAT&T DC
DC distance30.1 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.45¢/kWh
Industrial electricity7.23¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$4,026

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN117575

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Substation-Adjacent site at 39.787, -92.780 compare with other sites in Macon?

Substation-Adjacent site at 39.787, -92.780 ranks 27th of 43 scored candidate sites in Macon. Its 56.0/100 is roughly in line with the county average of 56.2. It is roughly in line with the Missouri average of 55.7 and roughly in line with the national average of 53.2.

Against the Missouri average, its strongest sub-score is power availability (46 vs 37) and its weakest is speed to power (49 vs 53). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Substation-Adjacent site at 39.787, -92.780 to power, fiber and other datacenters?

The nearest mapped substation, UNKNOWN117575, is about 0 miles away and operates at 69 kV. The nearest located transmission bottleneck is ALW16X26_WAPELLO_TR91_TR91 (MISO), 87 miles away. For connectivity, the nearest internet exchange facility is LightEdge Kansas City Subtropolis (KCI1) at 100.1 miles. 5 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is AT&T DC, 30.1 miles away.

What are the flood, water and hazard risks at Substation-Adjacent site at 39.787, -92.780?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk). At the county level, FEMA's National Risk Index rates Macon "Relatively High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
49
Fiber connectivity12%
74
Energy cost10%
50
Water risk7%
88
Natural hazard6%
62
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
50

Nearby comparable sites

Other scored datacenter candidate sites in Macon, ranked by DC Readiness.

Sites near Substation-Adjacent site at 39.787, -92.780
SiteTypeVoltageCapacityQueue waitScore
EC Near La PlataGreenfield——4.3 yrs60.8
EC Near Sub 2 Generating StationGreenfield——4.3 yrs60.3
EC Near La PlataGreenfield——4.3 yrs58.9
EC Near MaconGreenfield——4.3 yrs58.9
EC Near MaconGreenfield——4.3 yrs58.6
EC Near La PlataGreenfield——4.3 yrs58.5
EC Near Sub 2 Generating StationGreenfield——4.3 yrs58.4
EC Near La PlataGreenfield——4.3 yrs58.3

Substation-Adjacent site at 39.787, -92.780: common questions

What is the DC Readiness score of Substation-Adjacent site at 39.787, -92.780?

Substation-Adjacent site at 39.787, -92.780 scores 56.0/100 on the GridCensus DC Readiness scale, rated good. It ranks 27th of 43 scored sites in Macon. The Macon average is 56.2 and the Missouri average is 55.7.

What is the nearest substation to Substation-Adjacent site at 39.787, -92.780?

The nearest mapped substation is UNKNOWN117575, about 0 miles away, at 69 kV. GridCensus catalogs 50 MW of candidate capacity for the site.

Which electric utility serves Substation-Adjacent site at 39.787, -92.780?

UNION ELECTRIC CO - (MO) (investor owned) holds the retail service territory that contains the site; its holding company is AMEREN CORP.

What grid region is Substation-Adjacent site at 39.787, -92.780 in?

Substation-Adjacent site at 39.787, -92.780 is in the MISO region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

Is Substation-Adjacent site at 39.787, -92.780 in a flood zone?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk).

How far is Substation-Adjacent site at 39.787, -92.780 from an internet exchange?

The nearest internet exchange facility is LightEdge Kansas City Subtropolis (KCI1), about 100.1 miles away; 5 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Substation-Adjacent site at 39.787, -92.780, Macon, MO”, https://gridcensus.com/datacenter-sites/missouri/macon/unknown117575-0aec8e02 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Substation-Adjacent site at 39.787, -92.780, Macon is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.