Sub 2 Generating Station is a brownfield datacenter candidate site in Macon, Missouri, interconnecting through MISO. It screens at 54.9/100 DC Readiness with a catalogued 4 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Available capacity4 MW
LMP zoneMISO_ILLINOIS
Wholesale LMP$33.26/MWh
Utility commercial rate0.12¢/kWh
UtilityUNION ELECTRIC CO - (MO)investor ownedmoderate to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookFavorable
≈ 1.4 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth52
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPLightEdge Kansas City Subtropolis (KCI1)
IXP distance112.8 mi
Fiber providers5
Fiber coverage94.3%
Nearest cloud providerAzure
Nearest cloud regioncentralus
Cloud region distance150.3 mi

Site characteristics

Site typeBrownfield
Parcel ownerCity of Macon
Land contactState Environmental Cleanup Program
Land owner typeprivate
Buildability45.0/100
Land cover (NLCD)Deciduous Forest
Former useoil
Existing capacity4 MW
Retirement date2023-05-01

Risk & environment

Environmental constraintLow (30/100)
Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteBAKERS LOT
Hazard sub-score52/100
Construction cost index55.1 (avg 100)

Location context

Nearest datacenterAT&T DC
DC distance31.0 mi
Nearest rail0.7 mi
Nearest gas pipeline23.2 mi
Nearest fiber route87.2 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.45¢/kWh
Industrial electricity7.23¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$4,026

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Sub 2 Generating Station

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
23
Speed to power20%
41
Fiber connectivity12%
75
Energy cost10%
89
Water risk7%
88
Natural hazard6%
52
Buildability7%
45
Labor market4%
50
DC cluster4%
65
Land / acreage3%
72
Construction cost3%
100
Gas pipeline2%
25
Tax incentive1%
100
Climate / cooling1%
50

Nearby comparable sites

Other scored datacenter candidate sites in Macon, ranked by DC Readiness.

Sites near Sub 2 Generating Station
SiteTypeVoltageCapacityQueue waitScore
EC Near La PlataGreenfield——1.4 yrs61.4
EC Near Sub 2 Generating StationGreenfield——1.4 yrs60.9
EC Near La PlataGreenfield——1.4 yrs59.5
EC Near MaconGreenfield——1.4 yrs59.5
EC Near MaconGreenfield——1.4 yrs59.2
EC Near La PlataGreenfield——1.4 yrs59.1
EC Near Sub 2 Generating StationGreenfield——1.4 yrs59.0
EC Near La PlataGreenfield——1.4 yrs58.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Sub 2 Generating Station, Macon. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.