Datacenter Sites in Middlesex, Massachusetts

Middlesex has 281 scored datacenter candidate sites averaging 56.9/100 DC Readiness, with a catalogued aggregate of 6,256 MW. FEMA rates local natural-hazard risk as "Relatively Low".

At a glance

Middlesex, Massachusetts has 281 scored datacenter candidate sites averaging 56.9/100 DC Readiness, roughly in line with the Massachusetts average of 54.2. It ranks 2nd of 13 Massachusetts counties by number of sites and 2nd by average score. The top-scoring site is Substation-Adjacent site · 14370921 at 68.3/100.

281
Candidate sites
56.9/100
Avg DC Readiness
6,256 MW
Catalogued capacity
theoretical aggregate
Relatively Low
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Middlesex

Site-selection context for Middlesex

No
Datacenter tax incentive
17.00¢/kWh
Commercial electricity
16.19¢/kWh
Industrial electricity
11
Fiber providers
Low
Water stress
$22,138
Land price / acre
600
Cooling degree days
5,900
Heating degree days
49°F
Mean annual temp

How does Middlesex compare with other counties in Massachusetts?

By number of scored sites, Middlesex ranks 2nd of the 13 Massachusetts counties with a county page, holding 15% of the state's 1,861 sites. Its average DC Readiness of 56.9/100 ranks 2nd in the state and is roughly in line with the national average of 53.0. Nationally it has the 52nd-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 223 score 55 or higher.

What types of datacenter sites are in Middlesex?

Industrial sites are the most common (184, 65% of the county's inventory), followed by substation-adjacent (46) and greenfield (29). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Middlesex?

Industrial electricity averages 16.19¢/kWh and commercial 17.00¢/kWh. FEMA's National Risk Index rates the county "Relatively Low" (22). WRI water stress is low. 11 fiber providers report service in the county. The climate runs 600 cooling degree days a year with a mean temperature of 49°F. Land is valued around $22,138 an acre.

By site type

Top datacenter sites in Middlesex

Top datacenter sites in Middlesex
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN133682Substation-Adjacent450 kV600 MW4.3 yrs68.3
TEWKSBURY NO. 22ASubstation-Adjacent345 kV600 MW4.3 yrs67.2
LEXINGTONSubstation-Adjacent345 kV600 MW4.3 yrs67.0
WALTHAMSubstation-Adjacent230 kV300 MW4.3 yrs66.3
Westford St. LandfillBrownfield—2 MW4.3 yrs64.7
SUDBURYSubstation-Adjacent230 kV300 MW4.3 yrs64.7
Industri-plex SolarBrownfield345 kV4 MW4.3 yrs64.3
UNKNOWN140692Substation-Adjacent115 kV100 MW4.3 yrs63.6
FOREST AVENUE STATIONSubstation-Adjacent115 kV100 MW4.3 yrs62.1
TAP140691Substation-Adjacent115 kV100 MW4.3 yrs62.1
NORTHBORO ROADSubstation-Adjacent115 kV100 MW4.3 yrs62.1
PERRY STREETSubstation-Adjacent115 kV100 MW4.3 yrs62.0
READINGSubstation-Adjacent115 kV100 MW4.3 yrs61.9
TAP140687Substation-Adjacent115 kV100 MW4.3 yrs61.9
NORTH MARLBOROSubstation-Adjacent115 kV100 MW4.3 yrs61.9
TAP140689Substation-Adjacent115 kV100 MW4.3 yrs61.9
TAP140694Substation-Adjacent115 kV100 MW4.3 yrs61.9
TAP140697Substation-Adjacent115 kV100 MW4.3 yrs61.9
TRAPELO ROADSubstation-Adjacent115 kV100 MW4.3 yrs61.8
UNKNOWN139722Substation-Adjacent115 kV100 MW4.3 yrs61.8
HARTWELL AVENUESubstation-Adjacent115 kV100 MW4.3 yrs61.7
TAP140680Substation-Adjacent115 kV100 MW4.3 yrs61.7
BURLINGTONSubstation-Adjacent115 kV100 MW4.3 yrs61.6
TAP140674Substation-Adjacent115 kV100 MW4.3 yrs61.5
OZ MiddlesexGreenfield——4.3 yrs61.5

Every scored site in Middlesex

All 281 sites, best first.

Middlesex datacenter FAQ

How many datacenter sites are in Middlesex?

281 scored datacenter candidate sites, averaging 56.9/100 DC Readiness. That is the 2nd-most of 13 Massachusetts counties with five or more sites.

What is the highest-scoring datacenter site in Middlesex?

Substation-Adjacent site · 14370921 scores 68.3/100 DC Readiness, the highest of the 281 scored sites in Middlesex (a substation-adjacent site).

Does Middlesex offer datacenter tax incentives?

No datacenter-specific tax incentive is on record for Middlesex in the GridCensus county dataset.

What is the natural-hazard risk in Middlesex?

FEMA's National Risk Index rates Middlesex as "Relatively Low" (score 22).

What are industrial electricity rates in Middlesex?

Average industrial electricity is 16.19¢/kWh and commercial is 17.00¢/kWh in Middlesex.

More in Massachusetts

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Middlesex, Massachusetts”, https://gridcensus.com/datacenter-sites/massachusetts/middlesex (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Middlesex, Massachusetts is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.