Datacenter Sites in Seminole, Florida
Seminole has 74 scored datacenter candidate sites averaging 59.7/100 DC Readiness, with a catalogued aggregate of 5,902 MW. FEMA rates local natural-hazard risk as "Very High". The county has a datacenter tax incentive on record.
74
Candidate sites
59.7/100
Avg DC Readiness
5,902 MW
Catalogued capacity
theoretical aggregate
Very High
Hazard rating
Site-selection context for Seminole
Yessales_tax_exemption
Datacenter tax incentive
11.27¢/kWh
Commercial electricity
8.97¢/kWh
Industrial electricity
12
Fiber providers
Low-Medium
Water stress
$12,610
Land price / acre
3,500
Cooling degree days
700
Heating degree days
72°F
Mean annual temp
Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.
By site type
Top datacenter sites in Seminole
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| NORTH LONGWOOD | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 67.4 |
| UNKNOWN120247 | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 67.2 |
| UNKNOWN120263 | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 67.2 |
| UNKNOWN108681 | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 67.1 |
| UNKNOWN120252 | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 67.1 |
| COLLEGE | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 67.0 |
| UNKNOWN120534 | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 66.9 |
| RINEHART | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 66.8 |
| UNKNOWN120271 | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 66.5 |
| UNKNOWN120272 | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 66.3 |
| SANFORD | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 66.1 |
| BARNA | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 64.9 |
| OSTEEN | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 64.7 |
| OZ Seminole | Greenfield | — | — | 3.6 yrs | 64.3 |
| NORRIS | Substation-Adjacent | 230 kV | 300 MW | 1.0 yrs | 64.1 |
| UNKNOWN150736 | Substation-Adjacent | 115 kV | 100 MW | 1.0 yrs | 62.5 |
| EC Near Seminole Energy | Greenfield | — | — | 3.6 yrs | 62.4 |
| UNKNOWN133883 | Substation-Adjacent | 115 kV | 100 MW | 1.0 yrs | 62.4 |
| UNKNOWN108694 | Substation-Adjacent | 115 kV | 100 MW | 1.0 yrs | 62.4 |
| CELERY | Substation-Adjacent | 115 kV | 100 MW | 1.0 yrs | 62.1 |
| UNKNOWN108684 | Substation-Adjacent | 69 kV | 50 MW | 1.0 yrs | 61.2 |
| UNKNOWN120268 | Substation-Adjacent | 69 kV | 50 MW | 1.0 yrs | 60.8 |
| UNKNOWN108392 | Substation-Adjacent | 69 kV | 50 MW | 1.0 yrs | 60.7 |
| TAP151759 | Substation-Adjacent | 69 kV | 50 MW | 1.0 yrs | 60.6 |
| UNKNOWN120176 | Substation-Adjacent | 69 kV | 50 MW | 1.0 yrs | 60.5 |
Seminole datacenter FAQ
- How many datacenter sites are in Seminole?
- 74 scored datacenter candidate sites, averaging 59.7/100 DC Readiness.
- Does Seminole offer datacenter tax incentives?
- Sales tax exemption on manufacturing machinery including servers; no state income tax.
- What is the natural-hazard risk in Seminole?
- FEMA's National Risk Index rates Seminole as "Very High" (score 55).
- What are industrial electricity rates in Seminole?
- Average industrial electricity is 8.97¢/kWh and commercial is 11.27¢/kWh in Seminole.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Seminole, Florida. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.