Historic Goldsboro Park
IndustrialSeminole, Florida · SERC
At a glance
Historic Goldsboro Park is an industrial datacenter candidate site in Seminole, Florida, scoring 55.0/100 DC Readiness — 60th of 74 scored sites in the county. It sits in the SERC grid region and the FLORIDA POWER & LIGHT CO service territory, where interconnection has averaged 3.7 years from request to operation.
Power & interconnection
Speed to power
Middle-of-the-pack interconnection conditions for this grid.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
No notable statewide DC restriction on record; confirm local zoning and utility tariffs.
Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.
Site location
Get alerts
Track Historic Goldsboro Park
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
How does Historic Goldsboro Park compare with other sites in Seminole?
Historic Goldsboro Park ranks 60th of 74 scored candidate sites in Seminole. Its 55.0/100 is roughly in line with the county average of 58.2. It is roughly in line with the Florida average of 56.0 and roughly in line with the national average of 53.2.
Against the Florida average, its strongest sub-score is fiber connectivity (86 vs 73) and its weakest is power availability (30 vs 41). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.
How close is Historic Goldsboro Park to power, fiber and other datacenters?
For connectivity, the nearest internet exchange facility is Smart City Telecom Maitland Colo at 13.2 miles. 12 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Smart City Telecom Maitland Colo, 13.2 miles away.
What are the flood, water and hazard risks at Historic Goldsboro Park?
The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk). At the county level, FEMA's National Risk Index rates Seminole "Very High".
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Seminole, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| NORTH LONGWOOD | Substation-Adjacent | 230 kV | 300 MW | 3.7 yrs | 65.8 |
| UNKNOWN120247 | Substation-Adjacent | 230 kV | 300 MW | 3.7 yrs | 65.7 |
| UNKNOWN120263 | Substation-Adjacent | 230 kV | 300 MW | 3.7 yrs | 65.7 |
| UNKNOWN108681 | Substation-Adjacent | 230 kV | 300 MW | 3.7 yrs | 65.6 |
| COLLEGE | Substation-Adjacent | 230 kV | 300 MW | 3.7 yrs | 65.5 |
| UNKNOWN120252 | Substation-Adjacent | 230 kV | 300 MW | 3.7 yrs | 65.5 |
| UNKNOWN120534 | Substation-Adjacent | 230 kV | 300 MW | 3.7 yrs | 65.3 |
| RINEHART | Substation-Adjacent | 230 kV | 300 MW | 3.7 yrs | 65.3 |
Historic Goldsboro Park: common questions
What is the DC Readiness score of Historic Goldsboro Park?
Historic Goldsboro Park scores 55.0/100 on the GridCensus DC Readiness scale, rated good. It ranks 60th of 74 scored sites in Seminole. The Seminole average is 58.2 and the Florida average is 56.0.
Which electric utility serves Historic Goldsboro Park?
FLORIDA POWER & LIGHT CO (investor owned) holds the retail service territory that contains the site; its holding company is NEXTERA ENERGY INC.
What grid region is Historic Goldsboro Park in?
Historic Goldsboro Park is in the SERC region. Projects interconnecting there have averaged a 3.7-year wait from queue request to operation.
Is Historic Goldsboro Park in a flood zone?
The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk).
How far is Historic Goldsboro Park from an internet exchange?
The nearest internet exchange facility is Smart City Telecom Maitland Colo, about 13.2 miles away; 12 fiber providers report service at the location.
Related pages
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Historic Goldsboro Park, Seminole, FL”, https://gridcensus.com/datacenter-sites/florida/seminole/historic-goldsboro-park-217bf999 (data as of October 10, 2026).
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for Historic Goldsboro Park, Seminole is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.