BLACK'S AUTOMOTIVE

Industrial

Seminole, Florida · SERC

DC Readiness
55.8
Good / 100

BLACK'S AUTOMOTIVE is an industrial datacenter candidate site in Seminole, Florida, interconnecting through SERC. It screens at 55.8/100 DC Readiness and a 3.7 yrs average interconnection-queue wait.

Power & interconnection

UtilityDUKE ENERGY FLORIDA, LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 4.6 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.7 yrs
Recent queue wait4.6 yrs
Completion rate26%
Withdrawal rate74%

Connectivity

Nearest IXPSmart City Telecom Maitland Colo
IXP distance4.5 mi
Fiber providers12
Fiber coverage77.0%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low-Medium
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score45/100

Location context

Nearest datacenterSmart City Telecom Maitland Colo
DC distance4.5 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.27¢/kWh
Industrial electricity8.97¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$12,610

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track BLACK'S AUTOMOTIVE

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
65
Fiber connectivity12%
93
Energy cost10%
50
Water risk7%
76
Natural hazard6%
45
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Seminole, ranked by DC Readiness.

Sites near BLACK'S AUTOMOTIVE
SiteTypeVoltageCapacityQueue waitScore
NORTH LONGWOODSubstation-Adjacent230 kV300 MW3.7 yrs65.8
UNKNOWN120263Substation-Adjacent230 kV300 MW3.7 yrs65.7
UNKNOWN120247Substation-Adjacent230 kV300 MW3.7 yrs65.7
UNKNOWN108681Substation-Adjacent230 kV300 MW3.7 yrs65.6
COLLEGESubstation-Adjacent230 kV300 MW3.7 yrs65.5
UNKNOWN120252Substation-Adjacent230 kV300 MW3.7 yrs65.5
UNKNOWN120534Substation-Adjacent230 kV300 MW3.7 yrs65.3
RINEHARTSubstation-Adjacent230 kV300 MW3.7 yrs65.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for BLACK'S AUTOMOTIVE, Seminole is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.