OZ Seminole

Greenfield

Seminole, Florida · SERC

DC Readiness
64.3
Good / 100

OZ Seminole is a greenfield datacenter candidate site in Seminole, Florida, interconnecting through SERC. It screens at 64.3/100 DC Readiness and a 3.6 yrs average interconnection-queue wait.

Power & interconnection

Utility commercial rate0.11¢/kWh
UtilityFLORIDA POWER & LIGHT COinvestor ownedfavorable to large load · terms ≥ 50 MWLarge Load Contract Service (LLCS, ≥50 MW) · 90% min take · 20 yr

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.6 yrs
Recent queue wait3.3 yrs
Completion rate26%
Withdrawal rate74%

Connectivity

Nearest IXPSmart City Telecom Maitland Colo
IXP distance12.0 mi
Fiber providers12
Fiber coverage77.0%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance314.3 mi

Site characteristics

Site typeGreenfield
Land contactSeminole County Assessor
Land owner typeprivate
Buildability95.0/100
Land cover (NLCD)Developed, Medium Intensity

Risk & environment

Environmental constraintLow (30/100)
Flood zoneZone X
Water stress (WRI)1.20
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteSEMINOLE COUNTY SEMINOLE HIGH SCHOOL
Hazard sub-score35/100
Construction cost index92.2 (avg 100)

Location context

Nearest datacenterSmart City Telecom Maitland Colo
DC distance12.0 mi
Nearest rail0.8 mi
Nearest gas pipeline2.8 mi
Nearest fiber route21.7 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.27¢/kWh
Industrial electricity8.97¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$12,610

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track OZ Seminole

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
74
Fiber connectivity12%
71
Energy cost10%
89
Water risk7%
82
Natural hazard6%
35
Buildability7%
95
Labor market4%
50
DC cluster4%
80
Land / acreage3%
48
Construction cost3%
73
Gas pipeline2%
91
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Seminole, ranked by DC Readiness.

Sites near OZ Seminole
SiteTypeVoltageCapacityQueue waitScore
NORTH LONGWOODSubstation-Adjacent230 kV300 MW1.0 yrs67.4
UNKNOWN120263Substation-Adjacent230 kV300 MW1.0 yrs67.2
UNKNOWN120247Substation-Adjacent230 kV300 MW1.0 yrs67.2
UNKNOWN108681Substation-Adjacent230 kV300 MW1.0 yrs67.1
UNKNOWN120252Substation-Adjacent230 kV300 MW1.0 yrs67.1
COLLEGESubstation-Adjacent230 kV300 MW1.0 yrs67.0
UNKNOWN120534Substation-Adjacent230 kV300 MW1.0 yrs66.9
RINEHARTSubstation-Adjacent230 kV300 MW1.0 yrs66.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for OZ Seminole, Seminole. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.