Brownfield & Retired Power Plant Sites in Washington

21 catalogued brownfield and retired-generation sites in Washington, listed by former capacity. Each carries an existing utility-scale grid interconnection that a new datacenter load may be able to re-use.

At a glance

Washington has 21 brownfield and retired-generation sites in GridCensus: 20 retired power plants from EIA-860 and 1 EPA-tracked contaminated or reuse sites. Together they record 2,577 MW of existing or former generating capacity, 31st among 50 states and DC. The largest by capacity is Transalta Centralia Generation at 1,051.9 MW.

What kinds of former sites are in Washington?

By former use, the list includes 8 hydroelectric, 5 biomass, 3 natural gas, 2 coal, 2 oil, 1 landfill. Recorded retirement dates run from August 2001 to September 2022, with 7 retirements in 2015 or later. 19 of 20 sites with a measured distance sit within 2 miles of a transmission substation.

How does Washington compare with other states?

Washington ranks 34th of 50 states and DC by number of brownfield and retired-generation sites, out of 2,085 nationally. By recorded capacity (2,577 MW) it ranks 31st, against 289,280 MW across all states. The state also has 6,019 scored datacenter candidate sites, 8 of them classed as brownfield sites, averaging 51.7 on the 0–100 DC Readiness scale.

Where in Washington are these sites?

All brownfield and retired plant sites in Washington

SiteFormer useCapacityRetiredCounty
Transalta Centralia Generationcoal1,052 MW2020-12-01Lewis
Wanapumhydro1,038 MW2019-08-01Grant
Longview Fibregas90 MW2018-06-01Cowlitz
White River (WA)hydro70 MW2004-01-01Pierce
Steam plantbiomass50 MW2005-12-01Pierce
Diesel Generator Farmoil48 MW2001-08-01Chelan
Everett Cogenbiomass42 MW2011-10-01Snohomish
Randolph Roadoil32 MW2007-10-01Grant
SPI - Everettbiomass28 MW—Snohomish
HF Sinclair Puget Sound Refininggas27 MW2015-06-01Skagit
McKinley Paper Co. - Washington Millbiomass20 MW2017-04-01Clallam
Glines Hydroelectric Projecthydro16 MW2011-06-01Clallam
Condithydro14 MW2011-10-01Klickitat
Elwha Hydroelectric Projecthydro13 MW2011-06-01Clallam
Snoqualmie 2hydro10 MW2010-06-01King
Sullivan CRhydro9 MW—Pend Oreille
Port Townsend Paperbiomass6 MW2016-04-01Jefferson
Snoqualmiehydro6 MW2010-04-01King
University of Washington Power Plantgas5 MW2022-09-01King
Washington State Universitycoal2 MW2005-05-01Whitman
Vashon Recycling and Transfer Station Solar Projectlandfill0 MW——

Frequently asked questions

How many retired power plants are in Washington?

GridCensus lists 20 retired power plant sites in Washington from EIA-860 retirement records. 18 have a recorded retirement date, 7 of them in 2015 or later.

What is the largest retired power plant or brownfield site in Washington?

Transalta Centralia Generation in Centralia is the largest by recorded capacity, at 1,051.9 MW. It is followed by Wanapum (1,038 MW) and Longview Fibre (90 MW).

Which power plant in Washington retired most recently?

University of Washington Power Plant has the latest recorded retirement date in the state, September 2022, with 5 MW of capacity.

Which county in Washington has the most brownfield and retired plant sites?

Clallam County has the most, with 3, followed by King County with 3.

How many EPA brownfield sites in Washington have completed cleanup?

1 of the 1 EPA-tracked sites listed for Washington are recorded as cleanup complete.

Looking for a specific record? The directory lists every brownfield site, A to Z.

More on Washington, and states with similar counts

About this data

Source: EIA-860 retired generating units and EPA RE-Powering America's Land contaminated-site records, as published March 6, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Brownfield and retired power plant sites in Washington”, https://gridcensus.com/brownfield-sites/washington (data as of March 6, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for brownfield sites in Washington is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.