Sullivan CR

Brownfield

Metaline Falls, Pend Oreille, Washington · PUD No 1 of Pend Oreille County

Legacy capacity
9
MW

Sullivan CR is a former hydro site in Metaline Falls, Pend Oreille, Washington. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 9 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer hydro site
Site typeretired_plant
Existing capacity9 MW
EIA plant ID#773

Grid hookup & remediation

Nearest substation1.7 mi
OperatorPUD No 1 of Pend Oreille County
Operator address12391 Sullivan Lake Rd, Metaline Falls, WA, 99153
Why this site is datacenter-attractive: a former hydro site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Sullivan CR, ranked by DC Readiness.

Candidate sites near Sullivan CR
SiteTypeStateCountyVoltageCapacityQueue waitScore
BOUNDARYSubstation-AdjacentWAPend Oreille County230 kV300 MW1.7 yrs63.9
NELWAYSubstation-AdjacentWAPend Oreille County230 kV300 MW1.7 yrs63.3
TAP203494Substation-AdjacentWAPend Oreille County115 kV100 MW1.7 yrs61.1
TAP203493Substation-AdjacentWAPend Oreille County115 kV100 MW1.7 yrs60.7
Greenfield (CUSICK - BOUNDARY)GreenfieldWAPend Oreille County230 kV300 MW1.7 yrs60.0
Greenfield (CUSICK - BOUNDARY)GreenfieldWAPend Oreille County230 kV300 MW1.7 yrs59.6
BOX CANYONSubstation-AdjacentWAPend Oreille County115 kV100 MW1.7 yrs59.6
TAP203495Substation-AdjacentWAPend Oreille County115 kV100 MW1.7 yrs59.4

See all datacenter sites in Washington

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Sullivan CR, Metaline Falls, Pend Oreille, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.