Glines Hydroelectric Project
BrownfieldPort Angeles, Clallam, Washington · U S Bureau of Reclamation
Glines Hydroelectric Project is a former hydro site in Port Angeles, Clallam, Washington, retired 2011-06-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 16 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby datacenter candidate sites
Scored candidate sites near Glines Hydroelectric Project, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| PORT ANGELES | Substation-Adjacent | WA | Jefferson County | 230 kV | 300 MW | 6.9 yrs | 54.3 |
| OZ Clallam | Greenfield | WA | Clallam | — | — | 1.7 yrs | 53.6 |
| OZ Jefferson | Greenfield | WA | Jefferson | — | — | 1.7 yrs | 50.3 |
| TAP207151 | Substation-Adjacent | WA | Clallam County | 115 kV | 100 MW | 6.9 yrs | 49.9 |
| TAP207138 | Substation-Adjacent | WA | Jefferson County | 115 kV | 100 MW | 6.9 yrs | 49.9 |
| TAP207144 | Substation-Adjacent | WA | Clallam County | 115 kV | 100 MW | 6.9 yrs | 49.9 |
| TAP207136 | Substation-Adjacent | WA | Jefferson County | 115 kV | 100 MW | 6.9 yrs | 49.9 |
| UNKNOWN207141 | Substation-Adjacent | WA | Jefferson County | 115 kV | 100 MW | 6.9 yrs | 49.9 |
See all datacenter sites in Washington →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Glines Hydroelectric Project, Port Angeles, Clallam, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.