White River (WA)

Brownfield

Sumner, Pierce, Washington · Puget Sound Energy Inc

Legacy capacity
70
MW

White River (WA) is a former hydro site in Sumner, Pierce, Washington, retired 2004-01-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 70 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer hydro site
Site typeretired_plant
Existing capacity70 MW
Retirement date2004-01-01
EIA plant ID#3862

Grid hookup & remediation

Nearest substation0.3 mi
Operator address2111 E Valley Hwy, Sumner, WA, 98390
Why this site is datacenter-attractive: a former hydro site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Pierce County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)272,091
IT / tech employment187
Construction employment24,505
Land value$28,343/acre
Datacenter tax incentivesales_tax_exemption

Power economics & interconnection

Commercial power rate8.64¢/kWh
Industrial power rate6.91¢/kWh
Load growth (FERC-714)1.1%

Water & cooling

Water stressLow-Medium
Public water supply110.4 MGD
Industrial water use12.2 MGD
Cooling degree days300
Mean annual temp48°F

Hazard, flood & connectivity

FEMA risk index28.0 · Relatively Moderate
Fiber providers10 · 21% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near White River (WA) — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
Steam plantformer biomass site5011.6 mi—
Snoqualmie 2former hydro site1029.3 mi—
Snoqualmieformer hydro site629.1 mi—

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track White River (WA)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near White River (WA), ranked by DC Readiness.

Candidate sites near White River (WA)
SiteTypeStateCountyVoltageCapacityQueue waitScore
MAPLE VALLEYSubstation-AdjacentWAKing County500 kV1,000 MW6.9 yrs69.7
COVINGTONSubstation-AdjacentWAKing County500 kV1,000 MW6.9 yrs69.4
ECHO LAKESubstation-AdjacentWAKing County500 kV1,000 MW6.9 yrs68.6
RAVERSubstation-AdjacentWAKing County500 kV1,000 MW6.9 yrs67.8
TAP206230Substation-AdjacentWAKing County500 kV1,000 MW6.9 yrs67.5
OZ KingGreenfieldWAKing——1.7 yrs67.0
OBRIENSubstation-AdjacentWAKing County230 kV300 MW6.9 yrs66.5
OZ KingGreenfieldWAKing——1.7 yrs66.5

Nearby internet exchanges

See all datacenter sites in Washington →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for White River (WA), Sumner, Pierce, Washington. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.