Datacenter Sites in Pend Oreille, Washington
Pend Oreille has 24 scored datacenter candidate sites averaging 54.8/100 DC Readiness, with a catalogued aggregate of 2,709 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.
At a glance
Pend Oreille, Washington has 24 scored datacenter candidate sites averaging 54.8/100 DC Readiness, roughly in line with the Washington average of 51.7. It ranks 33rd of 39 Washington counties by number of sites and 16th by average score. The top-scoring site is USK at 60.7/100.
Site-selection context for Pend Oreille
Incentive detail: Sales tax exemption on DC equipment and construction for eligible facilities; no state income tax.
How does Pend Oreille compare with other counties in Washington?
By number of scored sites, Pend Oreille ranks 33rd of the 39 Washington counties with a county page, holding 0.4% of the state's 6,019 sites. Its average DC Readiness of 54.8/100 ranks 16th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1511th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 13 score 55 or higher.
What types of datacenter sites are in Pend Oreille?
Substation-Adjacent sites are the most common (14, 58% of the county's inventory), followed by greenfield (3) and former mine (3). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in Pend Oreille?
Industrial electricity averages 7.67¢/kWh and commercial 9.07¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (28). WRI water stress is low-medium. 5 fiber providers report service in the county. The climate runs 300 cooling degree days a year with a mean temperature of 48°F. Land is valued around $3,486 an acre.
By site type
Top datacenter sites in Pend Oreille
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| USK | Substation-Adjacent | 230 kV | 300 MW | 3.5 yrs | 60.7 |
| CUSICK | Substation-Adjacent | 230 kV | 300 MW | 3.5 yrs | 60.4 |
| SACHEEN | Substation-Adjacent | 230 kV | 300 MW | 3.5 yrs | 60.3 |
| BOUNDARY | Substation-Adjacent | 230 kV | 300 MW | 3.5 yrs | 59.2 |
| NELWAY | Substation-Adjacent | 230 kV | 300 MW | 4.3 yrs | 59.0 |
| OZ Pend Oreille | Greenfield | — | — | 3.5 yrs | 57.4 |
| TAP207702 | Substation-Adjacent | 115 kV | 100 MW | 3.5 yrs | 56.3 |
| CUSICK | Substation-Adjacent | 115 kV | 100 MW | 3.5 yrs | 56.3 |
| TAP207704 | Substation-Adjacent | 115 kV | 100 MW | 3.5 yrs | 55.9 |
| METALINE FALLS | Substation-Adjacent | 115 kV | 100 MW | 3.5 yrs | 55.5 |
| UNKNOWN201379 | Substation-Adjacent | 115 kV | 100 MW | 3.5 yrs | 55.4 |
| TAP203495 | Substation-Adjacent | 115 kV | 100 MW | 3.5 yrs | 55.4 |
| TAP203494 | Substation-Adjacent | 115 kV | 100 MW | 3.5 yrs | 55.4 |
| SPIRIT | Substation-Adjacent | 115 kV | 100 MW | 3.5 yrs | 54.7 |
| TAP203493 | Substation-Adjacent | 115 kV | 100 MW | 3.5 yrs | 54.6 |
| Greenfield (USK - BELL) | Greenfield | 230 kV | 300 MW | 3.5 yrs | 54.2 |
| Sullivan CR | Brownfield | — | 9 MW | 3.5 yrs | 54.1 |
| OZ Pend Oreille | Greenfield | — | — | 3.5 yrs | 51.8 |
| Mine Site | Former Mine | — | — | 3.5 yrs | 50.4 |
| Newport Industrial Park Development | Industrial | — | — | 3.5 yrs | 50.4 |
| Mine Site | Former Mine | — | — | 3.5 yrs | 50.3 |
| COLVILLE NATIONAL FOREST | Federal Excess | — | — | 3.5 yrs | 50.0 |
| Mine Site | Former Mine | — | — | 3.5 yrs | 49.5 |
| East Region | Federal Excess | — | — | 3.5 yrs | 49.1 |
Every scored site in Pend Oreille
All 24 sites, best first.
- USK · 60.7
- CUSICK · f25e59e7 · 60.4
- SACHEEN · 60.3
- BOUNDARY · 59.2
- OZ Pend Oreille · 74273885 · 57.4
- Substation-Adjacent site · 9a75f0df · 56.3
- CUSICK · bc01900b · 56.3
- Substation-Adjacent site · 0572da69 · 55.9
- METALINE FALLS · 55.5
- Substation-Adjacent site · a19732ac · 55.4
- Substation-Adjacent site · 629675dc · 55.4
- Substation-Adjacent site · e186de23 · 55.4
- SPIRIT · 54.7
- Substation-Adjacent site · 73c401a1 · 54.6
- Greenfield (USK - BELL) · 54.2
- Sullivan CR · 54.1
- OZ Pend Oreille · 009c33cb · 51.8
- Mine Site · 2c66fe1d · 50.4
- Newport Industrial Park Development · 50.4
- Mine Site · b2df5198 · 50.3
- COLVILLE NATIONAL FOREST · 454c6295 · 50.0
- Mine Site · 5fe71af3 · 49.5
- East Region · e69938f1 · 49.1
Pend Oreille datacenter FAQ
How many datacenter sites are in Pend Oreille?
24 scored datacenter candidate sites, averaging 54.8/100 DC Readiness. That is the 33rd-most of 39 Washington counties with five or more sites.
What is the highest-scoring datacenter site in Pend Oreille?
USK scores 60.7/100 DC Readiness, the highest of the 24 scored sites in Pend Oreille (a substation-adjacent site).
Does Pend Oreille offer datacenter tax incentives?
Sales tax exemption on DC equipment and construction for eligible facilities; no state income tax.
What is the natural-hazard risk in Pend Oreille?
FEMA's National Risk Index rates Pend Oreille as "Relatively Moderate" (score 28).
What are industrial electricity rates in Pend Oreille?
Average industrial electricity is 7.67¢/kWh and commercial is 9.07¢/kWh in Pend Oreille.
More in Washington
- All datacenter sites in Washington· 6,019 sites
- Operating datacenters in Washington
- Electric substations in Washington
- Grant County· 1,518 sites · avg 52.7
- Stevens County· 577 sites · avg 47.4
- Ferry County· 527 sites · avg 47.1
- King County· 344 sites · avg 56.1
- Franklin County· 305 sites · avg 50.6
- Lincoln County· 252 sites · avg 48.4
- Substation-Adjacent sites in Washington
- Greenfield sites in Washington
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in Pend Oreille, Washington”, https://gridcensus.com/datacenter-sites/washington/pend-oreille (data as of November 12, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for Pend Oreille, Washington is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.