SPI - Everett

Brownfield

Everett, Snohomish, Washington · Sierra Pacific Industries

Legacy capacity
28
MW

SPI - Everett is a former biomass site in Everett, Snohomish, Washington. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 28 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer biomass site
Site typeretired_plant
Existing capacity28 MW
EIA plant ID#56281

Grid hookup & remediation

Nearest substation0.8 mi
OperatorSierra Pacific Industries
Operator address515 East Marine View Drive, Everett, WA, 98206
Why this site is datacenter-attractive: a former biomass site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near SPI - Everett, ranked by DC Readiness.

Candidate sites near SPI - Everett
SiteTypeStateCountyVoltageCapacityQueue waitScore
SNO-KINGSubstation-AdjacentWAKitsap County500 kV1,000 MW1.7 yrs77.1
MONROESubstation-AdjacentWASnohomish County500 kV1,000 MW1.7 yrs76.2
SNOHOMISHSubstation-AdjacentWASnohomish County345 kV600 MW1.7 yrs75.2
TAP200917Substation-AdjacentWASnohomish County500 kV1,000 MW1.7 yrs74.7
BOTHELLSubstation-AdjacentWASnohomish County230 kV300 MW1.7 yrs73.9
MASSACHUSETTS STREETSubstation-AdjacentWAKitsap County230 kV300 MW1.7 yrs73.4
SEATTLE CITY EAST PINESubstation-AdjacentWAKitsap County230 kV300 MW1.7 yrs73.3
INVALIDSubstation-AdjacentWAKing County500 kV1,000 MW1.7 yrs72.7

Nearby internet exchanges

See all datacenter sites in Washington

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.