Datacenter Sites in TAZEWELL, Virginia
TAZEWELL has 111 scored datacenter candidate sites averaging 50.3/100 DC Readiness, with a catalogued aggregate of 700 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.
111
Candidate sites
50.3/100
Avg DC Readiness
700 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
Site-selection context for TAZEWELL
Yessales_tax_exemption
Datacenter tax incentive
7.67¢/kWh
Commercial electricity
5.33¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$3,488
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp
Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
By site type
Top datacenter sites in TAZEWELL
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| FARADAY | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 58.0 |
| OZ Tazewell | Greenfield | — | — | 3.1 yrs | 57.9 |
| EC FFE Tazewell County | Greenfield | — | — | 3.1 yrs | 57.3 |
| EC Coal Tazewell County | Greenfield | — | — | 3.1 yrs | 56.3 |
| EC Coal Tazewell County | Greenfield | — | — | 3.1 yrs | 55.5 |
| RICHLANDS | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 55.3 |
| EC Coal Tazewell County | Greenfield | — | — | 3.1 yrs | 55.2 |
| EC Coal Tazewell County | Greenfield | — | — | 3.1 yrs | 55.1 |
| BUCKHORN | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 54.5 |
| TAZEWELL | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 54.4 |
| CLAYPOOL HILL | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 54.3 |
| EC Coal Tazewell County | Greenfield | — | — | 3.1 yrs | 54.0 |
| EC Coal Tazewell County | Greenfield | — | — | 3.1 yrs | 53.9 |
| DEADEND167384 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 52.9 |
| TAP153937 | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 52.8 |
| JEWELL RIDGE | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 52.8 |
| RED OAK (AP) | Substation-Adjacent | 69 kV | 50 MW | 3.8 yrs | 52.7 |
| RICHLANDS NEWS PRESS (OTHER COMMERCIAL PRINTING) | Manufacturing | — | — | 3.5 yrs | 51.7 |
| MCCLURE CONCRETE, INC. (READY-MIX CONCRETE MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 51.7 |
| SPANDECK, INC. (OVERHEAD TRAVELING CRANE, HOIST, AND MONORAIL SYSTEM MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 51.7 |
| VIRGINIAN METAL PRODUCTS CO., INC. (MOTOR VEHICLE BODY MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 51.7 |
| EC Coal Tazewell County | Greenfield | — | — | 3.1 yrs | 51.6 |
| PLATNICK STEEL & ENGINEERING, INC. (FABRICATED STRUCTURAL METAL MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 50.9 |
| BLUEFIELD BEVERAGE CO. (FLAVORING SYRUP AND CONCENTRATE MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 50.9 |
| J & R MFG., INC. (ELECTRONIC CONNECTOR MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 50.9 |
TAZEWELL datacenter FAQ
- How many datacenter sites are in TAZEWELL?
- 111 scored datacenter candidate sites, averaging 50.3/100 DC Readiness.
- Does TAZEWELL offer datacenter tax incentives?
- Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
- What is the natural-hazard risk in TAZEWELL?
- FEMA's National Risk Index rates TAZEWELL as "Relatively Moderate" (score 30).
- What are industrial electricity rates in TAZEWELL?
- Average industrial electricity is 5.33¢/kWh and commercial is 7.67¢/kWh in TAZEWELL.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAZEWELL, Virginia. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.