TAZEWELL has 114 scored datacenter candidate sites averaging 52.8/100 DC Readiness, with a catalogued aggregate of 3,000 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

114
Candidate sites
52.8/100
Avg DC Readiness
3,000 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in TAZEWELL

Site-selection context for TAZEWELL

Yessales_tax_exemption
Datacenter tax incentive
7.67¢/kWh
Commercial electricity
5.33¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$3,488
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

By site type

Top datacenter sites in TAZEWELL

Top datacenter sites in TAZEWELL
SiteTypeVoltageCapacityQueue waitScore
OZ TazewellGreenfield3.1 yrs59.3
EC FFE Tazewell CountyGreenfield3.1 yrs58.6
EC Coal Tazewell CountyGreenfield3.1 yrs57.6
EC Coal Tazewell CountyGreenfield3.1 yrs56.9
EC Coal Tazewell CountyGreenfield3.1 yrs56.5
EC Coal Tazewell CountyGreenfield3.1 yrs56.5
FARADAYSubstation-Adjacent138 kV100 MW3.8 yrs55.5
EC Coal Tazewell CountyGreenfield3.1 yrs55.3
EC Coal Tazewell CountyGreenfield3.1 yrs55.3
EC Coal Tazewell CountyGreenfield3.1 yrs52.9
RICHLANDS NEWS PRESS (OTHER COMMERCIAL PRINTING)Manufacturing3.5 yrs52.7
MCCLURE CONCRETE, INC. (READY-MIX CONCRETE MANUFACTURING)Manufacturing3.5 yrs52.7
VIRGINIAN METAL PRODUCTS CO., INC. (MOTOR VEHICLE BODY MANUFACTURING)Manufacturing3.5 yrs52.7
SPANDECK, INC. (OVERHEAD TRAVELING CRANE, HOIST, AND MONORAIL SYSTEM MANUFACTURING)Manufacturing3.5 yrs52.6
RICHLANDSSubstation-Adjacent138 kV100 MW3.8 yrs52.3
PLATNICK STEEL & ENGINEERING, INC. (FABRICATED STRUCTURAL METAL MANUFACTURING)Manufacturing3.5 yrs51.9
LIMESTONE DUST CORP., THE (CUT STONE AND STONE PRODUCT MANUFACTURING)Manufacturing3.5 yrs51.9
CLA, INC. (MINING MACHINERY AND EQUIPMENT MANUFACTURING)Manufacturing3.5 yrs51.9
POUNDING MILL QUARRY CORP. (CUT STONE AND STONE PRODUCT MANUFACTURING)Manufacturing3.5 yrs51.9
THISTLE FOUNDRY & MACHINE CO. (STEEL FOUNDRIES (EXCEPT INVESTMENT))Manufacturing3.5 yrs51.9
PYOTT-BOONE ELECTRONICS, INC. (BARE PRINTED CIRCUIT BOARD MANUFACTURING)Manufacturing3.5 yrs51.9
FLOYD ASPHALT PAVING CO., INC. (ASPHALT PAVING MIXTURE AND BLOCK MANUFACTURING)Manufacturing3.5 yrs51.9
JOY MINING MACHINERY (MINING MACHINERY AND EQUIPMENT MANUFACTURING)Manufacturing3.5 yrs51.8
NORRIS SCREEN & MFG., INC. (OTHER FABRICATED WIRE PRODUCT MANUFACTURING)Manufacturing3.5 yrs51.8
APPALACHIAN MINE SALES, INC. (MINING MACHINERY AND EQUIPMENT MANUFACTURING)Manufacturing3.5 yrs51.8

TAZEWELL datacenter FAQ

How many datacenter sites are in TAZEWELL?
114 scored datacenter candidate sites, averaging 52.8/100 DC Readiness.
Does TAZEWELL offer datacenter tax incentives?
Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
What is the natural-hazard risk in TAZEWELL?
FEMA's National Risk Index rates TAZEWELL as "Relatively Moderate" (score 30).
What are industrial electricity rates in TAZEWELL?
Average industrial electricity is 5.33¢/kWh and commercial is 7.67¢/kWh in TAZEWELL.

Dataset updated . Screening estimates derived from public data sources.