Skip to content
Gridcensus

Datacenter Sites in TAZEWELL, Virginia

TAZEWELL has 111 scored datacenter candidate sites averaging 50.3/100 DC Readiness, with a catalogued aggregate of 700 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

111
Candidate sites
50.3/100
Avg DC Readiness
700 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in TAZEWELL

Site-selection context for TAZEWELL

Yessales_tax_exemption
Datacenter tax incentive
7.67¢/kWh
Commercial electricity
5.33¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$3,488
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

By site type

Top datacenter sites in TAZEWELL

Top datacenter sites in TAZEWELL
SiteTypeVoltageCapacityQueue waitScore
FARADAYSubstation-Adjacent138 kV100 MW3.8 yrs58.0
OZ TazewellGreenfield——3.1 yrs57.9
EC FFE Tazewell CountyGreenfield——3.1 yrs57.3
EC Coal Tazewell CountyGreenfield——3.1 yrs56.3
EC Coal Tazewell CountyGreenfield——3.1 yrs55.5
RICHLANDSSubstation-Adjacent138 kV100 MW3.8 yrs55.3
EC Coal Tazewell CountyGreenfield——3.1 yrs55.2
EC Coal Tazewell CountyGreenfield——3.1 yrs55.1
BUCKHORNSubstation-Adjacent138 kV100 MW3.8 yrs54.5
TAZEWELLSubstation-Adjacent138 kV100 MW3.8 yrs54.4
CLAYPOOL HILLSubstation-Adjacent138 kV100 MW3.8 yrs54.3
EC Coal Tazewell CountyGreenfield——3.1 yrs54.0
EC Coal Tazewell CountyGreenfield——3.1 yrs53.9
DEADEND167384Substation-Adjacent69 kV50 MW3.8 yrs52.9
TAP153937Substation-Adjacent69 kV50 MW3.8 yrs52.8
JEWELL RIDGESubstation-Adjacent69 kV50 MW3.8 yrs52.8
RED OAK (AP)Substation-Adjacent69 kV50 MW3.8 yrs52.7
RICHLANDS NEWS PRESS (OTHER COMMERCIAL PRINTING)Manufacturing——3.5 yrs51.7
MCCLURE CONCRETE, INC. (READY-MIX CONCRETE MANUFACTURING)Manufacturing——3.5 yrs51.7
SPANDECK, INC. (OVERHEAD TRAVELING CRANE, HOIST, AND MONORAIL SYSTEM MANUFACTURING)Manufacturing——3.5 yrs51.7
VIRGINIAN METAL PRODUCTS CO., INC. (MOTOR VEHICLE BODY MANUFACTURING)Manufacturing——3.5 yrs51.7
EC Coal Tazewell CountyGreenfield——3.1 yrs51.6
PLATNICK STEEL & ENGINEERING, INC. (FABRICATED STRUCTURAL METAL MANUFACTURING)Manufacturing——3.5 yrs50.9
BLUEFIELD BEVERAGE CO. (FLAVORING SYRUP AND CONCENTRATE MANUFACTURING)Manufacturing——3.5 yrs50.9
J & R MFG., INC. (ELECTRONIC CONNECTOR MANUFACTURING)Manufacturing——3.5 yrs50.9

TAZEWELL datacenter FAQ

How many datacenter sites are in TAZEWELL?
111 scored datacenter candidate sites, averaging 50.3/100 DC Readiness.
Does TAZEWELL offer datacenter tax incentives?
Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
What is the natural-hazard risk in TAZEWELL?
FEMA's National Risk Index rates TAZEWELL as "Relatively Moderate" (score 30).
What are industrial electricity rates in TAZEWELL?
Average industrial electricity is 5.33¢/kWh and commercial is 7.67¢/kWh in TAZEWELL.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAZEWELL, Virginia. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.