Former Mine site at 37.128, -81.791

Former Mine

TAZEWELL, Virginia · PJM

DC Readiness
49.7
Fair / 100

At a glance

Former Mine site at 37.128, -81.791 is a former mine datacenter candidate site in TAZEWELL, Virginia, scoring 49.7/100 DC Readiness — 32nd of 111 scored sites in the county. It sits in the PJM grid region and the VIRGINIA ELECTRIC & POWER CO service territory, where interconnection has averaged 5.1 years from request to operation.

Power & interconnection

UtilityVIRGINIA ELECTRIC & POWER COinvestor ownedmoderate to large load · terms ≥ 25 MWSchedule GS-5 (large general service, ≥25 MW) · 85% min take · 14 yr

Speed to power

Interconnection outlookConstrained
≈ 6.0 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionPJM
Queue depth907
Avg queue wait5.1 yrs
Recent queue wait6.0 yrs
Completion rate20%
Withdrawal rate80%

Connectivity

Nearest IXPEast Kentucky Network Data Center
IXP distance58.6 mi
Fiber providers5
Fiber coverage46.7%

Site characteristics

Site typeFormer Mine
Former useMining: Coal; Status: Abandoned
Cleanup statusAbandoned

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score70/100

Location context

Nearest datacenterEast Kentucky Network Datacenter
DC distance58.7 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity7.67¢/kWh
Industrial electricity5.33¢/kWh
Cooling degree days1,300
Heating degree days4,000
Land price / acre$3,488

Regulatory climate

Moderatestate posture · as of 2026-08

Largest US DC market; incentive preserved but a new $0.011/kWh DC electricity tax starts Jul 2026.

DC tax incentiveYes
Large-load threshold≥ 25 MW

Dominion GS-5 large-load rate (≥25 MW, ~$1.5M/MW collateral, 14-yr term) effective 2027.

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Mine Site

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Former Mine site at 37.128, -81.791 compare with other sites in TAZEWELL?

Former Mine site at 37.128, -81.791 ranks 32nd of 111 scored candidate sites in TAZEWELL. Its 49.7/100 is roughly in line with the county average of 50.1. It is roughly in line with the Virginia average of 52.6 and roughly in line with the national average of 53.2.

Against the Virginia average, its strongest sub-score is natural hazard (70 vs 69) and its weakest is fiber connectivity (63 vs 71). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Former Mine site at 37.128, -81.791 to power, fiber and other datacenters?

The nearest located transmission bottleneck is FREMNT-FREMONTC A 138 KV (PJM), 33 miles away. For connectivity, the nearest internet exchange facility is East Kentucky Network Data Center at 58.6 miles. 5 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is East Kentucky Network Datacenter, 58.7 miles away.

What are the flood, water and hazard risks at Former Mine site at 37.128, -81.791?

At the county level, FEMA's National Risk Index rates TAZEWELL "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
45
Fiber connectivity12%
63
Energy cost10%
50
Water risk7%
88
Natural hazard6%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
46
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
60

Nearby comparable sites

Other scored datacenter candidate sites in TAZEWELL, ranked by DC Readiness.

Sites near Former Mine site at 37.128, -81.791
SiteTypeVoltageCapacityQueue waitScore
OZ TazewellGreenfield——5.1 yrs57.8
FARADAYSubstation-Adjacent138 kV100 MW3.0 yrs57.8
EC FFE Tazewell CountyGreenfield——5.1 yrs57.2
EC Coal Tazewell CountyGreenfield——5.1 yrs56.2
RICHLANDSSubstation-Adjacent138 kV100 MW5.1 yrs56.1
EC Coal Tazewell CountyGreenfield——5.1 yrs55.4
BUCKHORNSubstation-Adjacent138 kV100 MW5.1 yrs55.3
TAZEWELLSubstation-Adjacent138 kV100 MW5.1 yrs55.2

Former Mine site at 37.128, -81.791: common questions

What is the DC Readiness score of Former Mine site at 37.128, -81.791?

Former Mine site at 37.128, -81.791 scores 49.7/100 on the GridCensus DC Readiness scale, rated fair. It ranks 32nd of 111 scored sites in TAZEWELL. The TAZEWELL average is 50.1 and the Virginia average is 52.6.

Which electric utility serves Former Mine site at 37.128, -81.791?

VIRGINIA ELECTRIC & POWER CO (investor owned) holds the retail service territory that contains the site; its holding company is DOMINION RESOURCES.

What grid region is Former Mine site at 37.128, -81.791 in?

Former Mine site at 37.128, -81.791 is in the PJM region. Projects interconnecting there have averaged a 5.1-year wait from queue request to operation.

How far is Former Mine site at 37.128, -81.791 from an internet exchange?

The nearest internet exchange facility is East Kentucky Network Data Center, about 58.6 miles away; 5 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Former Mine site at 37.128, -81.791, TAZEWELL, VA”, https://gridcensus.com/datacenter-sites/virginia/tazewell/mine-site-3bec59db (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Former Mine site at 37.128, -81.791, TAZEWELL is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.