EC Coal Tazewell County

Greenfield

TAZEWELL, Virginia · PJM

DC Readiness
50.3
Fair / 100

At a glance

EC Coal Tazewell County is a greenfield datacenter candidate site in TAZEWELL, Virginia, scoring 50.3/100 DC Readiness — 19th of 111 scored sites in the county. It sits in the PJM grid region and the VIRGINIA ELECTRIC & POWER CO service territory, where interconnection has averaged 5.1 years from request to operation.

Power & interconnection

LMP zonePJM_DOM
Wholesale LMP$43.92/MWh
Utility commercial rate0.08¢/kWh
UtilityVIRGINIA ELECTRIC & POWER COinvestor ownedmoderate to large load · terms ≥ 25 MWSchedule GS-5 (large general service, ≥25 MW) · 85% min take · 14 yr

Speed to power

Interconnection outlookConstrained
≈ 6.0 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionPJM
Queue depth907
Avg queue wait5.1 yrs
Recent queue wait6.0 yrs
Completion rate20%
Withdrawal rate80%

Connectivity

Nearest IXPEast Kentucky Network Data Center
IXP distance74.5 mi
Fiber providers5
Fiber coverage46.7%
Nearest cloud providerAzure
Nearest cloud regioneastus
Cloud region distance86.4 mi

Site characteristics

Site typeGreenfield
Land contactTazewell County County Assessor
Land owner typeprivate
Buildability45.0/100
Land cover (NLCD)Deciduous Forest
Former usecoal adjacent

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score70/100
Construction cost index70.6 (avg 100)

Location context

Nearest datacenterEast Kentucky Network Datacenter
DC distance74.4 mi
Nearest rail3.2 mi
Nearest gas pipeline16.3 mi
Nearest fiber route139.0 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity7.67¢/kWh
Industrial electricity5.33¢/kWh
Cooling degree days1,300
Heating degree days4,000
Land price / acre$3,488

Regulatory climate

Moderatestate posture · as of 2026-08

Largest US DC market; incentive preserved but a new $0.011/kWh DC electricity tax starts Jul 2026.

DC tax incentiveYes
Large-load threshold≥ 25 MW

Dominion GS-5 large-load rate (≥25 MW, ~$1.5M/MW collateral, 14-yr term) effective 2027.

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Coal Tazewell County

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does EC Coal Tazewell County compare with other sites in TAZEWELL?

EC Coal Tazewell County ranks 19th of 111 scored candidate sites in TAZEWELL. Its 50.3/100 is roughly in line with the county average of 50.1. It is roughly in line with the Virginia average of 52.6 and roughly in line with the national average of 53.2.

Against the Virginia average, its strongest sub-score is water (89 vs 88) and its weakest is fiber connectivity (19 vs 71). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is EC Coal Tazewell County to power, fiber and other datacenters?

The nearest located transmission bottleneck is FREMNT-FREMONTC A 138 KV (PJM), 57 miles away. For connectivity, the nearest internet exchange facility is East Kentucky Network Data Center at 74.5 miles. 5 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is East Kentucky Network Datacenter, 74.4 miles away.

What are the flood, water and hazard risks at EC Coal Tazewell County?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk). WRI rates baseline water stress at 0.60 on a 0–5 scale. No mapped wetlands are recorded on the parcel. At the county level, FEMA's National Risk Index rates TAZEWELL "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
45
Fiber connectivity12%
19
Energy cost10%
95
Water risk7%
89
Natural hazard6%
70
Buildability7%
45
Labor market4%
50
DC cluster4%
30
Land / acreage3%
46
Construction cost3%
91
Gas pipeline2%
48
Tax incentive1%
100
Climate / cooling1%
60

Nearby comparable sites

Other scored datacenter candidate sites in TAZEWELL, ranked by DC Readiness.

Sites near EC Coal Tazewell County
SiteTypeVoltageCapacityQueue waitScore
OZ TazewellGreenfield——5.1 yrs57.8
FARADAYSubstation-Adjacent138 kV100 MW3.0 yrs57.8
EC FFE Tazewell CountyGreenfield——5.1 yrs57.2
EC Coal Tazewell CountyGreenfield——5.1 yrs56.2
RICHLANDSSubstation-Adjacent138 kV100 MW5.1 yrs56.1
EC Coal Tazewell CountyGreenfield——5.1 yrs55.4
BUCKHORNSubstation-Adjacent138 kV100 MW5.1 yrs55.3
TAZEWELLSubstation-Adjacent138 kV100 MW5.1 yrs55.2

EC Coal Tazewell County: common questions

What is the DC Readiness score of EC Coal Tazewell County?

EC Coal Tazewell County scores 50.3/100 on the GridCensus DC Readiness scale, rated fair. It ranks 19th of 111 scored sites in TAZEWELL. The TAZEWELL average is 50.1 and the Virginia average is 52.6.

Which electric utility serves EC Coal Tazewell County?

VIRGINIA ELECTRIC & POWER CO (investor owned) holds the retail service territory that contains the site; its holding company is DOMINION RESOURCES.

What grid region is EC Coal Tazewell County in?

EC Coal Tazewell County is in the PJM region. Projects interconnecting there have averaged a 5.1-year wait from queue request to operation.

Is EC Coal Tazewell County in a flood zone?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk).

Who owns EC Coal Tazewell County?

Parcel records list the owner as APPALACHIAN POWER CO (private land).

How far is EC Coal Tazewell County from an internet exchange?

The nearest internet exchange facility is East Kentucky Network Data Center, about 74.5 miles away; 5 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “EC Coal Tazewell County, TAZEWELL, VA”, https://gridcensus.com/datacenter-sites/virginia/tazewell/ec-coal-tazewell-county-2d6337ed (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for EC Coal Tazewell County, TAZEWELL is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.