Datacenter Sites in Norfolk, Virginia

Norfolk has 71 scored datacenter candidate sites averaging 56.9/100 DC Readiness, with a catalogued aggregate of 1,100 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

Norfolk, Virginia has 71 scored datacenter candidate sites averaging 56.9/100 DC Readiness, roughly in line with the Virginia average of 52.2. It ranks 18th of 122 Virginia counties by number of sites and 12th by average score. The top-scoring site is INDUSTRIAL PARK at 66.3/100.

71
Candidate sites
56.9/100
Avg DC Readiness
1,100 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Norfolk

Site-selection context for Norfolk

Yessales_tax_exemption
Datacenter tax incentive
4.81¢/kWh
Commercial electricity
4.19¢/kWh
Industrial electricity
6
Fiber providers
Low
Water stress
$5,900
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

How does Norfolk compare with other counties in Virginia?

By number of scored sites, Norfolk ranks 18th of the 122 Virginia counties with a county page, holding 1.2% of the state's 5,871 sites. Its average DC Readiness of 56.9/100 ranks 12th in the state and is roughly in line with the national average of 53.0. Nationally it has the 513th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 61 score 55 or higher.

What types of datacenter sites are in Norfolk?

Shovel-Ready sites are the most common (51, 72% of the county's inventory), followed by industrial (8) and substation-adjacent (7). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Norfolk?

Industrial electricity averages 4.19¢/kWh and commercial 4.81¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 6 fiber providers report service in the county. The climate runs 1,300 cooling degree days a year with a mean temperature of 55°F. Land is valued around $5,900 an acre.

By site type

Top datacenter sites in Norfolk

Top datacenter sites in Norfolk
SiteTypeVoltageCapacityQueue waitScore
INDUSTRIAL PARKSubstation-Adjacent230 kV300 MW5.1 yrs66.3
OZ NorfolkGreenfield——5.1 yrs65.5
OZ NorfolkGreenfield——5.1 yrs65.2
GREENWICHSubstation-Adjacent230 kV300 MW5.1 yrs65.0
OZ NorfolkGreenfield——5.1 yrs63.5
OZ NorfolkGreenfield——5.1 yrs63.4
OZ NorfolkGreenfield——5.1 yrs63.2
UNKNOWN115505Substation-Adjacent115 kV100 MW5.1 yrs61.8
BURTONSubstation-Adjacent115 kV100 MW5.1 yrs60.9
DAVISSubstation-Adjacent115 kV100 MW5.1 yrs60.7
UNKNOWN115508Substation-Adjacent115 kV100 MW5.1 yrs60.5
TAP161807Substation-Adjacent115 kV100 MW5.1 yrs60.5
3800 Village AvenueShovel-Ready——5.1 yrs56.1
5360 Robin Hood RoadShovel-Ready——5.1 yrs56.1
Norfolk Commerce Center IIIShovel-Ready——5.1 yrs56.1
Norfolk Commerce Park IIShovel-Ready——5.1 yrs56.1
Norfolk Commerce Park - 5358 Robin Hood RdShovel-Ready——5.1 yrs56.1
Almeda Business CenterShovel-Ready——5.1 yrs56.0
3440-3442 Trant AvenueShovel-Ready——5.1 yrs56.0
1129-1157 Production RoadShovel-Ready——5.1 yrs56.0
Twin Oaks IShovel-Ready——5.1 yrs56.0
Twin Oaks IIShovel-Ready——5.1 yrs56.0
1320 Ingleside RoadShovel-Ready——5.1 yrs56.0
3634 Village AvenueShovel-Ready——5.1 yrs56.0
3321 E. Princess Anne RoadShovel-Ready——5.1 yrs56.0

Every scored site in Norfolk

All 71 sites, best first.

Norfolk datacenter FAQ

How many datacenter sites are in Norfolk?

71 scored datacenter candidate sites, averaging 56.9/100 DC Readiness. That is the 18th-most of 122 Virginia counties with five or more sites.

What is the highest-scoring datacenter site in Norfolk?

INDUSTRIAL PARK scores 66.3/100 DC Readiness, the highest of the 71 scored sites in Norfolk (a substation-adjacent site).

Does Norfolk offer datacenter tax incentives?

Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

What is the natural-hazard risk in Norfolk?

FEMA's National Risk Index rates Norfolk as "Relatively Moderate" (score 30).

What are industrial electricity rates in Norfolk?

Average industrial electricity is 4.19¢/kWh and commercial is 4.81¢/kWh in Norfolk.

More in Virginia

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Norfolk, Virginia”, https://gridcensus.com/datacenter-sites/virginia/norfolk (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Norfolk, Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.