Decker Property

Shovel-Ready

Norfolk, Virginia · PJM

DC Readiness
55.2
Good / 100

Decker Property is a shovel-ready datacenter candidate site in Norfolk, Virginia, interconnecting through PJM. It screens at 55.2/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionPJM
Queue depth864

Connectivity

Nearest IXPEdgeConneX Norfolk (EDCNOR01)
IXP distance2.6 mi

Site characteristics

Site typeShovel-Ready
Acreage2 ac
Former useBrownfield

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score70/100

Location context

Nearest datacenterEdgeConneX Norfolk (EDCNOR01)
DC distance2.6 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity4.81¢/kWh
Industrial electricity4.19¢/kWh
Cooling degree days1,300
Heating degree days4,000
Land price / acre$5,900

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
38
Fiber connectivity12%
88
Energy cost10%
50
Water risk8%
88
Natural hazard8%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
100
Land / acreage3%
31
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
60

Nearby comparable sites

Other scored datacenter candidate sites in Norfolk, ranked by DC Readiness.

Sites near Decker Property
SiteTypeVoltageCapacityQueue waitScore
INDUSTRIAL PARKSubstation-Adjacent230 kV300 MW3.1 yrs75.4
UNKNOWN115505Substation-Adjacent115 kV100 MW3.1 yrs72.2
DAVISSubstation-Adjacent115 kV100 MW3.1 yrs71.8
BURTONSubstation-Adjacent115 kV100 MW3.1 yrs71.7
UNKNOWN147083Substation-Adjacent115 kV100 MW3.1 yrs69.8
GREENWICHSubstation-Adjacent230 kV300 MW3.1 yrs68.7
TAP161807Substation-Adjacent115 kV100 MW3.1 yrs67.1
OZ NorfolkGreenfield3.1 yrs66.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Decker Property, Norfolk. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.