Datacenter Sites in Montgomery, Virginia

Montgomery has 65 scored datacenter candidate sites averaging 49.0/100 DC Readiness, with a catalogued aggregate of 700 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

Montgomery, Virginia has 65 scored datacenter candidate sites averaging 49.0/100 DC Readiness, roughly in line with the Virginia average of 52.2. It ranks 21st of 122 Virginia counties by number of sites and 113th by average score. The top-scoring site is EC Near Radford Army Ammunition Plant · 255184d2 at 56.7/100.

65
Candidate sites
49.0/100
Avg DC Readiness
700 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Montgomery

Site-selection context for Montgomery

Yessales_tax_exemption
Datacenter tax incentive
8.09¢/kWh
Commercial electricity
5.75¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$5,743
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

How does Montgomery compare with other counties in Virginia?

By number of scored sites, Montgomery ranks 21st of the 122 Virginia counties with a county page, holding 1.1% of the state's 5,871 sites. Its average DC Readiness of 49.0/100 ranks 113th in the state and is roughly in line with the national average of 53.0. Nationally it has the 567th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 1 score 55 or higher.

What types of datacenter sites are in Montgomery?

Manufacturing sites are the most common (35, 54% of the county's inventory), followed by shovel-ready (14) and greenfield (8). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Montgomery?

Industrial electricity averages 5.75¢/kWh and commercial 8.09¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 5 fiber providers report service in the county. The climate runs 1,300 cooling degree days a year with a mean temperature of 55°F. Land is valued around $5,743 an acre.

By site type

Top datacenter sites in Montgomery

Top datacenter sites in Montgomery
SiteTypeVoltageCapacityQueue waitScore
EC Near Radford Army Ammunition PlantGreenfield——5.1 yrs56.7
EC Near Radford Army Ammunition PlantGreenfield——5.1 yrs54.9
EC Near Radford Army Ammunition PlantGreenfield——5.1 yrs54.6
EC Near Radford Army Ammunition PlantGreenfield——5.1 yrs54.3
EC Near Radford Army Ammunition PlantGreenfield——5.1 yrs54.1
EC Near Radford Army Ammunition PlantGreenfield——5.1 yrs53.9
MERRIMACSubstation-Adjacent138 kV100 MW5.1 yrs53.8
FALLING BRANCHSubstation-Adjacent138 kV100 MW5.1 yrs53.8
SOUTH CHRISTIANBURGSubstation-Adjacent138 kV100 MW5.1 yrs53.8
SOUTH CHRISTIANSBURGSubstation-Adjacent138 kV100 MW5.1 yrs53.8
VICKERSubstation-Adjacent138 kV100 MW5.1 yrs53.8
SHAWSVILLESubstation-Adjacent138 kV100 MW5.1 yrs53.7
NORTH BLACKSBURGSubstation-Adjacent138 kV100 MW5.1 yrs53.7
EC Near Radford Army Ammunition PlantGreenfield——5.1 yrs53.1
EC Near Radford Army Ammunition PlantGreenfield——5.1 yrs50.3
BIG SPRING MILL, INC. (OTHER ANIMAL FOOD MANUFACTURING)Manufacturing——5.1 yrs48.3
ROWE FURNITURE, INC. (UPHOLSTERED HOUSEHOLD FURNITURE MANUFACTURING)Manufacturing——5.1 yrs48.3
SOUTH STAR CORP. (OTHER ELECTRONIC COMPONENT MANUFACTURING)Manufacturing——5.1 yrs48.3
Mine SiteFormer Mine——5.1 yrs48.3
SOUTHLAND LOG HOMES, INC. (PREFABRICATED WOOD BUILDING MANUFACTURING)Manufacturing——5.1 yrs48.3
Virginia Tech Corporate Research Center - Phase II SitesShovel-Ready——5.1 yrs47.8
VTCRC Building RBXVShovel-Ready——5.1 yrs47.6
VTCRC Building RB XVIShovel-Ready——5.1 yrs47.6
VTCRC Building RB XShovel-Ready——5.1 yrs47.6
Virginia Tech Corporate Research CenterShovel-Ready——5.1 yrs47.6

Every scored site in Montgomery

All 65 sites, best first.

Montgomery datacenter FAQ

How many datacenter sites are in Montgomery?

65 scored datacenter candidate sites, averaging 49.0/100 DC Readiness. That is the 21st-most of 122 Virginia counties with five or more sites.

What is the highest-scoring datacenter site in Montgomery?

EC Near Radford Army Ammunition Plant · 255184d2 scores 56.7/100 DC Readiness, the highest of the 65 scored sites in Montgomery (a greenfield site).

Does Montgomery offer datacenter tax incentives?

Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

What is the natural-hazard risk in Montgomery?

FEMA's National Risk Index rates Montgomery as "Relatively Moderate" (score 30).

What are industrial electricity rates in Montgomery?

Average industrial electricity is 5.75¢/kWh and commercial is 8.09¢/kWh in Montgomery.

More in Virginia

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Montgomery, Virginia”, https://gridcensus.com/datacenter-sites/virginia/montgomery (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Montgomery, Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.