EC Near Radford Army Ammunition Plant

Greenfield

Montgomery, Virginia · PJM

DC Readiness
57.4
Good / 100

EC Near Radford Army Ammunition Plant is a greenfield datacenter candidate site in Montgomery, Virginia, interconnecting through PJM. It screens at 57.4/100 DC Readiness and a 3.1 yrs average interconnection-queue wait.

Power & interconnection

LMP zonePJM_DOM
Wholesale LMP$43.92/MWh
Utility commercial rate0.08¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth864
Avg queue wait3.1 yrs
Recent queue wait3.6 yrs
Completion rate20%
Withdrawal rate80%

Connectivity

Nearest IXPCitynet Charleston
IXP distance99.0 mi
Fiber providers4
Fiber coverage55.7%
Nearest cloud providerAzure
Nearest cloud regioneastus
Cloud region distance45.0 mi

Site characteristics

Site typeGreenfield
Parcel ownerAPPALACHIAN POWER CO
Land owner typeprivate
Buildability45.0/100
Land cover (NLCD)Deciduous Forest
Former usenear retired gas plant (5km)

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score70/100
Construction cost index97.5 (avg 100)

Location context

Nearest datacenterLumos Networks
DC distance81.7 mi
Nearest rail0.5 mi
Nearest gas pipeline2.2 mi
Nearest fiber route66.6 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity8.09¢/kWh
Industrial electricity5.75¢/kWh
Cooling degree days1,300
Heating degree days4,000
Land price / acre$5,743

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
44
Fiber connectivity12%
65
Energy cost10%
95
Water risk8%
88
Natural hazard8%
70
Buildability7%
45
Labor market4%
50
DC cluster4%
30
Land / acreage3%
46
Construction cost3%
69
Gas pipeline2%
93
Tax incentive2%
100
Climate / cooling2%
60

Nearby comparable sites

Other scored datacenter candidate sites in Montgomery, ranked by DC Readiness.

Sites near EC Near Radford Army Ammunition Plant
SiteTypeVoltageCapacityQueue waitScore
JACKSONS FERRYSubstation-Adjacent765 kV1,000 MW3.0 yrs71.1
Greenfield (CLOVERDALE 765KV - JACKSONS FE)Greenfield765 kV1,000 MW3.0 yrs66.0
VICKERSubstation-Adjacent138 kV100 MW3.1 yrs65.0
MERRIMACSubstation-Adjacent138 kV100 MW3.1 yrs64.6
SHAWSVILLESubstation-Adjacent138 kV100 MW3.1 yrs64.2
Greenfield (CLOVERDALE 765KV - JACKSONS FE)Greenfield765 kV1,000 MW3.0 yrs64.1
Greenfield (MATT FUNK - KANAWHA RIVER)Greenfield345 kV600 MW3.0 yrs62.8
SOUTH CHRISTIANSBURGSubstation-Adjacent138 kV100 MW3.1 yrs62.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Near Radford Army Ammunition Plant, Montgomery. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.