ROHM & HAAS CO. (PRINTED CIRCUIT ASSEMBLY (ELECTRONIC ASSEMBLY) MANUFACTURING)
ManufacturingMontgomery, Virginia · PJM
At a glance
ROHM & HAAS CO. (PRINTED CIRCUIT ASSEMBLY (ELECTRONIC ASSEMBLY) MANUFACTURING) is a manufacturing datacenter candidate site in Montgomery, Virginia, scoring 47.9/100 DC Readiness — 51st of 65 scored sites in the county. It sits in the PJM grid region and the CRAIG-BOTETOURT ELECTRIC COOP service territory, where interconnection has averaged 5.1 years from request to operation.
Power & interconnection
Speed to power
Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
Largest US DC market; incentive preserved but a new $0.011/kWh DC electricity tax starts Jul 2026.
Dominion GS-5 large-load rate (≥25 MW, ~$1.5M/MW collateral, 14-yr term) effective 2027.
Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
Site location
Get alerts
Track ROHM & HAAS CO. (PRINTED CIRCUIT ASSEMBLY (ELECTRONIC ASSEMBLY) MANUFACTURING)
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
How does ROHM & HAAS CO. (PRINTED CIRCUIT ASSEMBLY (ELECTRONIC ASSEMBLY) MANUFACTURING) compare with other sites in Montgomery?
ROHM & HAAS CO. (PRINTED CIRCUIT ASSEMBLY (ELECTRONIC ASSEMBLY) MANUFACTURING) ranks 51st of 65 scored candidate sites in Montgomery. Its 47.9/100 is roughly in line with the county average of 49.5. It is roughly in line with the Virginia average of 52.6 and roughly in line with the national average of 53.2.
Against the Virginia average, its strongest sub-score is natural hazard (70 vs 69) and its weakest is fiber connectivity (55 vs 71). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.
How close is ROHM & HAAS CO. (PRINTED CIRCUIT ASSEMBLY (ELECTRONIC ASSEMBLY) MANUFACTURING) to power, fiber and other datacenters?
The nearest located transmission bottleneck is MTAIRYTP-RENAN 35E2 B 69 KV (PJM), 59 miles away. For connectivity, the nearest internet exchange facility is Citynet Charleston at 105.3 miles. 5 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Lumos Networks, 70.3 miles away.
What are the flood, water and hazard risks at ROHM & HAAS CO. (PRINTED CIRCUIT ASSEMBLY (ELECTRONIC ASSEMBLY) MANUFACTURING)?
The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk). At the county level, FEMA's National Risk Index rates Montgomery "Relatively Moderate".
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Montgomery, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| EC Near Radford Army Ammunition Plant | Greenfield | — | — | 5.1 yrs | 57.2 |
| EC Near Radford Army Ammunition Plant | Greenfield | — | — | 5.1 yrs | 55.4 |
| EC Near Radford Army Ammunition Plant | Greenfield | — | — | 5.1 yrs | 55.1 |
| EC Near Radford Army Ammunition Plant | Greenfield | — | — | 5.1 yrs | 54.8 |
| EC Near Radford Army Ammunition Plant | Greenfield | — | — | 5.1 yrs | 54.6 |
| EC Near Radford Army Ammunition Plant | Greenfield | — | — | 5.1 yrs | 54.4 |
| SOUTH CHRISTIANSBURG | Substation-Adjacent | 138 kV | 100 MW | 5.1 yrs | 54.3 |
| VICKER | Substation-Adjacent | 138 kV | 100 MW | 5.1 yrs | 54.3 |
ROHM & HAAS CO. (PRINTED CIRCUIT ASSEMBLY (ELECTRONIC ASSEMBLY) MANUFACTURING): common questions
What is the DC Readiness score of ROHM & HAAS CO. (PRINTED CIRCUIT ASSEMBLY (ELECTRONIC ASSEMBLY) MANUFACTURING)?
ROHM & HAAS CO. (PRINTED CIRCUIT ASSEMBLY (ELECTRONIC ASSEMBLY) MANUFACTURING) scores 47.9/100 on the GridCensus DC Readiness scale, rated fair. It ranks 51st of 65 scored sites in Montgomery. The Montgomery average is 49.5 and the Virginia average is 52.6.
Which electric utility serves ROHM & HAAS CO. (PRINTED CIRCUIT ASSEMBLY (ELECTRONIC ASSEMBLY) MANUFACTURING)?
CRAIG-BOTETOURT ELECTRIC COOP (not available) holds the retail service territory that contains the site.
What grid region is ROHM & HAAS CO. (PRINTED CIRCUIT ASSEMBLY (ELECTRONIC ASSEMBLY) MANUFACTURING) in?
ROHM & HAAS CO. (PRINTED CIRCUIT ASSEMBLY (ELECTRONIC ASSEMBLY) MANUFACTURING) is in the PJM region. Projects interconnecting there have averaged a 5.1-year wait from queue request to operation.
Is ROHM & HAAS CO. (PRINTED CIRCUIT ASSEMBLY (ELECTRONIC ASSEMBLY) MANUFACTURING) in a flood zone?
The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk).
How far is ROHM & HAAS CO. (PRINTED CIRCUIT ASSEMBLY (ELECTRONIC ASSEMBLY) MANUFACTURING) from an internet exchange?
The nearest internet exchange facility is Citynet Charleston, about 105.3 miles away; 5 fiber providers report service at the location.
Related pages
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “ROHM & HAAS CO. (PRINTED CIRCUIT ASSEMBLY (ELECTRONIC ASSEMBLY) MANUFACTURING), Montgomery, VA”, https://gridcensus.com/datacenter-sites/virginia/montgomery/rohm-haas-co-printed-circuit-assembly-electronic-assembly-manufacturing-16b07a1c (data as of October 10, 2026).
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for ROHM & HAAS CO. (PRINTED CIRCUIT ASSEMBLY (ELECTRONIC ASSEMBLY) MANUFACTURING), Montgomery is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.