Datacenter Sites in Chesterfield, Virginia

Chesterfield has 110 scored datacenter candidate sites averaging 54.9/100 DC Readiness, with a catalogued aggregate of 2,800 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

110
Candidate sites
54.9/100
Avg DC Readiness
2,800 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Chesterfield

Site-selection context for Chesterfield

Yessales_tax_exemption
Datacenter tax incentive
5.78¢/kWh
Commercial electricity
4.85¢/kWh
Industrial electricity
2
Fiber providers
Low
Water stress
$8,136
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

By site type

Top datacenter sites in Chesterfield

Top datacenter sites in Chesterfield
SiteTypeVoltageCapacityQueue waitScore
MIDLOTHIANSubstation-Adjacent500 kV1,000 MW3.8 yrs67.6
IRON BRIDGESubstation-Adjacent230 kV300 MW3.8 yrs63.3
TAP146381Substation-Adjacent230 kV300 MW3.8 yrs63.3
HULL STREET ROADSubstation-Adjacent230 kV300 MW3.8 yrs63.1
UNKNOWN116246Substation-Adjacent230 kV300 MW3.8 yrs63.1
EC Coal Chesterfield CountyGreenfield——3.1 yrs62.7
EC Near Park 500 Philip Morris USAGreenfield——3.1 yrs62.7
OZ ChesterfieldGreenfield——3.1 yrs62.7
OZ ChesterfieldGreenfield——3.1 yrs61.7
WINTERPOCKSubstation-Adjacent230 kV300 MW3.8 yrs61.6
EC Near Park 500 Philip Morris USAGreenfield——3.1 yrs61.4
EC Near ChesterfieldGreenfield——3.1 yrs61.0
EC Coal Chesterfield CountyGreenfield——3.1 yrs60.9
EC Near ChesterfieldGreenfield——3.1 yrs59.7
EC Near ChesterfieldGreenfield——3.1 yrs59.5
EC Coal Chesterfield CountyGreenfield——3.1 yrs59.4
CENTRALIASubstation-Adjacent115 kV100 MW3.8 yrs59.3
EC Near Park 500 Philip Morris USAGreenfield——3.1 yrs59.3
UNKNOWN161687Substation-Adjacent115 kV100 MW3.8 yrs58.0
EC Near ChesterfieldGreenfield——3.1 yrs57.3
TAP161686Substation-Adjacent115 kV100 MW3.8 yrs57.1
EC Coal Chesterfield CountyGreenfield——3.1 yrs57.1
EC Near ChesterfieldGreenfield——3.1 yrs56.2
EC Near ChesterfieldGreenfield——3.1 yrs54.6
Meadowville Technology ParkShovel-Ready——3.8 yrs54.5

Chesterfield datacenter FAQ

How many datacenter sites are in Chesterfield?
110 scored datacenter candidate sites, averaging 54.9/100 DC Readiness.
Does Chesterfield offer datacenter tax incentives?
Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
What is the natural-hazard risk in Chesterfield?
FEMA's National Risk Index rates Chesterfield as "Relatively Moderate" (score 30).
What are industrial electricity rates in Chesterfield?
Average industrial electricity is 4.85¢/kWh and commercial is 5.78¢/kWh in Chesterfield.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Chesterfield, Virginia. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.