Datacenter Sites in Chesterfield, Virginia

Chesterfield has 110 scored datacenter candidate sites averaging 55.0/100 DC Readiness, with a catalogued aggregate of 2,800 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

Chesterfield, Virginia has 110 scored datacenter candidate sites averaging 55.0/100 DC Readiness, roughly in line with the Virginia average of 52.2. It ranks 10th of 122 Virginia counties by number of sites and 29th by average score. The top-scoring site is MIDLOTHIAN at 67.1/100.

110
Candidate sites
55.0/100
Avg DC Readiness
2,800 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Chesterfield

Site-selection context for Chesterfield

Yessales_tax_exemption
Datacenter tax incentive
5.78¢/kWh
Commercial electricity
4.85¢/kWh
Industrial electricity
2
Fiber providers
Low
Water stress
$8,136
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

How does Chesterfield compare with other counties in Virginia?

By number of scored sites, Chesterfield ranks 10th of the 122 Virginia counties with a county page, holding 1.9% of the state's 5,871 sites. Its average DC Readiness of 55.0/100 ranks 29th in the state and is roughly in line with the national average of 53.0. Nationally it has the 293rd-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 23 score 55 or higher.

What types of datacenter sites are in Chesterfield?

Shovel-Ready sites are the most common (84, 76% of the county's inventory), followed by greenfield (16) and substation-adjacent (9). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Chesterfield?

Industrial electricity averages 4.85¢/kWh and commercial 5.78¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 2 fiber providers report service in the county. The climate runs 1,300 cooling degree days a year with a mean temperature of 55°F. Land is valued around $8,136 an acre.

By site type

Top datacenter sites in Chesterfield

Top datacenter sites in Chesterfield
SiteTypeVoltageCapacityQueue waitScore
MIDLOTHIANSubstation-Adjacent500 kV1,000 MW5.1 yrs67.1
TAP146381Substation-Adjacent230 kV300 MW5.1 yrs63.7
IRON BRIDGESubstation-Adjacent230 kV300 MW5.1 yrs63.7
HULL STREET ROADSubstation-Adjacent230 kV300 MW5.1 yrs63.4
UNKNOWN116246Substation-Adjacent230 kV300 MW5.1 yrs62.6
EC Coal Chesterfield CountyGreenfield——5.1 yrs62.1
OZ ChesterfieldGreenfield——5.1 yrs62.1
EC Near Park 500 Philip Morris USAGreenfield——5.1 yrs62.1
WINTERPOCKSubstation-Adjacent230 kV300 MW5.1 yrs62.0
OZ ChesterfieldGreenfield——5.1 yrs61.1
EC Near Park 500 Philip Morris USAGreenfield——5.1 yrs60.8
EC Near ChesterfieldGreenfield——5.1 yrs60.4
EC Coal Chesterfield CountyGreenfield——5.1 yrs60.3
CENTRALIASubstation-Adjacent115 kV100 MW5.1 yrs59.6
EC Near ChesterfieldGreenfield——5.1 yrs59.1
EC Near ChesterfieldGreenfield——5.1 yrs58.9
EC Coal Chesterfield CountyGreenfield——5.1 yrs58.8
EC Near Park 500 Philip Morris USAGreenfield——5.1 yrs58.7
UNKNOWN161687Substation-Adjacent115 kV100 MW5.1 yrs58.3
TAP161686Substation-Adjacent115 kV100 MW5.1 yrs57.4
EC Near ChesterfieldGreenfield——5.1 yrs56.7
EC Coal Chesterfield CountyGreenfield——5.1 yrs56.5
EC Near ChesterfieldGreenfield——5.1 yrs55.6
Meadowville Technology ParkShovel-Ready——5.1 yrs54.9
2701 Bermuda Hundred RdShovel-Ready——5.1 yrs54.8

Every scored site in Chesterfield

All 110 sites, best first.

Chesterfield datacenter FAQ

How many datacenter sites are in Chesterfield?

110 scored datacenter candidate sites, averaging 55.0/100 DC Readiness. That is the 10th-most of 122 Virginia counties with five or more sites.

What is the highest-scoring datacenter site in Chesterfield?

MIDLOTHIAN scores 67.1/100 DC Readiness, the highest of the 110 scored sites in Chesterfield (a substation-adjacent site).

Does Chesterfield offer datacenter tax incentives?

Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

What is the natural-hazard risk in Chesterfield?

FEMA's National Risk Index rates Chesterfield as "Relatively Moderate" (score 30).

What are industrial electricity rates in Chesterfield?

Average industrial electricity is 4.85¢/kWh and commercial is 5.78¢/kWh in Chesterfield.

More in Virginia

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 13, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Chesterfield, Virginia”, https://gridcensus.com/datacenter-sites/virginia/chesterfield (data as of November 13, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Chesterfield, Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.