Gather Midlothian
Shovel-ReadyChesterfield, Virginia · PJM
At a glance
Gather Midlothian is a shovel-ready datacenter candidate site in Chesterfield, Virginia, scoring 54.0/100 DC Readiness — 72nd of 110 scored sites in the county. It sits in the PJM grid region and the VIRGINIA ELECTRIC & POWER CO service territory, where interconnection has averaged 5.1 years from request to operation.
Power & interconnection
Speed to power
Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
Largest US DC market; incentive preserved but a new $0.011/kWh DC electricity tax starts Jul 2026.
Dominion GS-5 large-load rate (≥25 MW, ~$1.5M/MW collateral, 14-yr term) effective 2027.
Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
Site location
Get alerts
Track Gather Midlothian
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
How does Gather Midlothian compare with other sites in Chesterfield?
Gather Midlothian ranks 72nd of 110 scored candidate sites in Chesterfield. Its 54.0/100 is roughly in line with the county average of 55.5. It is roughly in line with the Virginia average of 52.6 and roughly in line with the national average of 53.2.
Against the Virginia average, its strongest sub-score is fiber connectivity (85 vs 71) and its weakest is power availability (30 vs 35). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.
How close is Gather Midlothian to power, fiber and other datacenters?
The nearest located transmission bottleneck is HARWGATE-LOCKS 205C B 230 KV (PJM), 22 miles away. For connectivity, the nearest internet exchange facility is EdgeConneX Richmond (EDCRIC01) at 14.2 miles. 2 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is EdgeConneX Richmond (EDCRIC01), 14.2 miles away.
What are the flood, water and hazard risks at Gather Midlothian?
At the county level, FEMA's National Risk Index rates Chesterfield "Relatively Moderate".
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Chesterfield, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| MIDLOTHIAN | Substation-Adjacent | 500 kV | 1,000 MW | 5.1 yrs | 67.6 |
| IRON BRIDGE | Substation-Adjacent | 230 kV | 300 MW | 5.1 yrs | 64.2 |
| TAP146381 | Substation-Adjacent | 230 kV | 300 MW | 5.1 yrs | 64.1 |
| HULL STREET ROAD | Substation-Adjacent | 230 kV | 300 MW | 5.1 yrs | 63.9 |
| UNKNOWN116246 | Substation-Adjacent | 230 kV | 300 MW | 5.1 yrs | 63.1 |
| EC Near Park 500 Philip Morris USA | Greenfield | — | — | 5.1 yrs | 62.6 |
| OZ Chesterfield | Greenfield | — | — | 5.1 yrs | 62.6 |
| EC Coal Chesterfield County | Greenfield | — | — | 5.1 yrs | 62.5 |
Gather Midlothian: common questions
What is the DC Readiness score of Gather Midlothian?
Gather Midlothian scores 54.0/100 on the GridCensus DC Readiness scale, rated fair. It ranks 72nd of 110 scored sites in Chesterfield. The Chesterfield average is 55.5 and the Virginia average is 52.6.
Which electric utility serves Gather Midlothian?
VIRGINIA ELECTRIC & POWER CO (investor owned) holds the retail service territory that contains the site; its holding company is DOMINION RESOURCES.
What grid region is Gather Midlothian in?
Gather Midlothian is in the PJM region. Projects interconnecting there have averaged a 5.1-year wait from queue request to operation.
How far is Gather Midlothian from an internet exchange?
The nearest internet exchange facility is EdgeConneX Richmond (EDCRIC01), about 14.2 miles away; 2 fiber providers report service at the location.
Related pages
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Gather Midlothian, Chesterfield, VA”, https://gridcensus.com/datacenter-sites/virginia/chesterfield/gather-midlothian-be58694b (data as of October 10, 2026).
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for Gather Midlothian, Chesterfield is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.