OZ Chesterfield

Greenfield

Chesterfield, Virginia · PJM

DC Readiness
63.9
Good / 100

OZ Chesterfield is a greenfield datacenter candidate site in Chesterfield, Virginia, interconnecting through PJM. It screens at 63.9/100 DC Readiness and a 3.1 yrs average interconnection-queue wait.

Power & interconnection

LMP zonePJM_DOM
Wholesale LMP$43.92/MWh
Utility commercial rate0.06¢/kWh
UtilityVIRGINIA ELECTRIC & POWER COinvestor ownedmoderate to large load · terms ≥ 25 MWSchedule GS-5 (large general service, ≥25 MW) · 85% min take · 14 yr

Speed to power

Interconnection outlookConstrained
≈ 3.6 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionPJM
Queue depth878
Avg queue wait3.1 yrs
Recent queue wait3.6 yrs
Completion rate20%
Withdrawal rate80%

Connectivity

Nearest IXPQTS Richmond - (RIC5)
IXP distance12.2 mi
Fiber providers2
Fiber coverage87.2%
Nearest cloud providerAzure
Nearest cloud regioneastus2
Cloud region distance72.6 mi

Site characteristics

Site typeGreenfield
Land contactChesterfield County Assessor
Land owner typeprivate
Buildability92.0/100
Land cover (NLCD)Developed, Low Intensity

Risk & environment

Environmental constraintLow (30/100)
Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteBELLWOOD ELEMENTARY
Hazard sub-score60/100
Construction cost index107.5 (avg 100)

Location context

Nearest datacenterVirginia Information Technologies Agency
DC distance6.1 mi
Nearest rail0.8 mi
Nearest gas pipeline0.5 mi
Nearest fiber route70.5 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity5.78¢/kWh
Industrial electricity4.85¢/kWh
Cooling degree days1,300
Heating degree days4,000
Land price / acre$8,136

Regulatory climate

Moderatestate posture · as of 2026-08

Largest US DC market; incentive preserved but a new $0.011/kWh DC electricity tax starts Jul 2026.

DC tax incentiveYes
Large-load threshold≥ 25 MW

Dominion GS-5 large-load rate (≥25 MW, ~$1.5M/MW collateral, 14-yr term) effective 2027.

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track OZ Chesterfield

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
44
Fiber connectivity12%
87
Energy cost10%
83
Water risk7%
88
Natural hazard6%
60
Buildability7%
92
Labor market4%
50
DC cluster4%
90
Land / acreage3%
54
Construction cost3%
60
Gas pipeline2%
98
Tax incentive1%
100
Climate / cooling1%
60

Nearby comparable sites

Other scored datacenter candidate sites in Chesterfield, ranked by DC Readiness.

Sites near OZ Chesterfield
SiteTypeVoltageCapacityQueue waitScore
MIDLOTHIANSubstation-Adjacent500 kV1,000 MW3.8 yrs68.9
TAP146381Substation-Adjacent230 kV300 MW3.8 yrs64.6
IRON BRIDGESubstation-Adjacent230 kV300 MW3.8 yrs64.6
UNKNOWN116246Substation-Adjacent230 kV300 MW3.8 yrs64.4
HULL STREET ROADSubstation-Adjacent230 kV300 MW3.8 yrs64.4
EC Near Park 500 Philip Morris USAGreenfield——3.1 yrs64.1
EC Coal Chesterfield CountyGreenfield——3.1 yrs64.0
WINTERPOCKSubstation-Adjacent230 kV300 MW3.8 yrs62.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for OZ Chesterfield, Chesterfield is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.