Datacenter Sites in Seminole, Oklahoma

Seminole has 42 scored datacenter candidate sites averaging 53.9/100 DC Readiness, with a catalogued aggregate of 1,650 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

42
Candidate sites
53.9/100
Avg DC Readiness
1,650 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Seminole

Site-selection context for Seminole

Yessales_tax_exemption
Datacenter tax incentive
9.48¢/kWh
Commercial electricity
5.80¢/kWh
Industrial electricity
4
Fiber providers
Low-Medium
Water stress
$2,633
Land price / acre
1,900
Cooling degree days
3,600
Heating degree days
60°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.

By site type

Top datacenter sites in Seminole

Top datacenter sites in Seminole
SiteTypeVoltageCapacityQueue waitScore
SEMINOLESubstation-Adjacent345 kV600 MW3.3 yrs60.9
OZ SeminoleGreenfield3.5 yrs60.1
EC Near Seminole (OK)Greenfield3.5 yrs59.0
EC Near Seminole (OK)Greenfield3.5 yrs58.3
EC Near Seminole (OK)Greenfield3.5 yrs58.1
EC Near Seminole (OK)Greenfield3.5 yrs57.7
EC Near Seminole (OK)Greenfield3.5 yrs57.7
EC FFE Seminole CountyGreenfield3.5 yrs57.7
OZ SeminoleGreenfield3.5 yrs57.3
EC Near Seminole (OK)Greenfield3.5 yrs57.3
EC Near Seminole (OK)Greenfield3.5 yrs56.4
EC Near Seminole (OK)Greenfield3.5 yrs56.4
TAP149652Substation-Adjacent138 kV100 MW3.3 yrs56.2
UNKNOWN118944Substation-Adjacent138 kV100 MW3.3 yrs56.2
SEMINOLESubstation-Adjacent138 kV100 MW3.3 yrs56.1
TAP149648Substation-Adjacent138 kV100 MW3.3 yrs56.1
UNKNOWN118936Substation-Adjacent138 kV100 MW3.3 yrs56.1
TAP149644Substation-Adjacent138 kV100 MW3.3 yrs55.9
UNKNOWN118946Substation-Adjacent138 kV100 MW3.3 yrs55.4
OZ SeminoleGreenfield3.5 yrs55.4
TAP168556Substation-Adjacent69 kV50 MW3.3 yrs53.8
UNKNOWN168557Substation-Adjacent69 kV50 MW3.3 yrs53.8
TAP149647Substation-Adjacent69 kV50 MW3.3 yrs53.6
TAP149169Substation-Adjacent69 kV50 MW3.3 yrs52.9
UNKNOWN118876Substation-Adjacent69 kV50 MW3.3 yrs52.9

Seminole datacenter FAQ

How many datacenter sites are in Seminole?
42 scored datacenter candidate sites, averaging 53.9/100 DC Readiness.
Does Seminole offer datacenter tax incentives?
Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.
What is the natural-hazard risk in Seminole?
FEMA's National Risk Index rates Seminole as "Relatively High" (score 42).
What are industrial electricity rates in Seminole?
Average industrial electricity is 5.80¢/kWh and commercial is 9.48¢/kWh in Seminole.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Seminole, Oklahoma. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.