Datacenter Sites in Seminole, Oklahoma
Seminole has 42 scored datacenter candidate sites averaging 53.9/100 DC Readiness, with a catalogued aggregate of 1,650 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.
42
Candidate sites
53.9/100
Avg DC Readiness
1,650 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
Site-selection context for Seminole
Yessales_tax_exemption
Datacenter tax incentive
9.48¢/kWh
Commercial electricity
5.80¢/kWh
Industrial electricity
4
Fiber providers
Low-Medium
Water stress
$2,633
Land price / acre
1,900
Cooling degree days
3,600
Heating degree days
60°F
Mean annual temp
Incentive detail: Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.
By site type
Top datacenter sites in Seminole
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| SEMINOLE | Substation-Adjacent | 345 kV | 600 MW | 3.3 yrs | 60.9 |
| OZ Seminole | Greenfield | — | — | 3.5 yrs | 60.1 |
| EC Near Seminole (OK) | Greenfield | — | — | 3.5 yrs | 59.0 |
| EC Near Seminole (OK) | Greenfield | — | — | 3.5 yrs | 58.3 |
| EC Near Seminole (OK) | Greenfield | — | — | 3.5 yrs | 58.1 |
| EC Near Seminole (OK) | Greenfield | — | — | 3.5 yrs | 57.7 |
| EC Near Seminole (OK) | Greenfield | — | — | 3.5 yrs | 57.7 |
| EC FFE Seminole County | Greenfield | — | — | 3.5 yrs | 57.7 |
| OZ Seminole | Greenfield | — | — | 3.5 yrs | 57.3 |
| EC Near Seminole (OK) | Greenfield | — | — | 3.5 yrs | 57.3 |
| EC Near Seminole (OK) | Greenfield | — | — | 3.5 yrs | 56.4 |
| EC Near Seminole (OK) | Greenfield | — | — | 3.5 yrs | 56.4 |
| TAP149652 | Substation-Adjacent | 138 kV | 100 MW | 3.3 yrs | 56.2 |
| UNKNOWN118944 | Substation-Adjacent | 138 kV | 100 MW | 3.3 yrs | 56.2 |
| SEMINOLE | Substation-Adjacent | 138 kV | 100 MW | 3.3 yrs | 56.1 |
| TAP149648 | Substation-Adjacent | 138 kV | 100 MW | 3.3 yrs | 56.1 |
| UNKNOWN118936 | Substation-Adjacent | 138 kV | 100 MW | 3.3 yrs | 56.1 |
| TAP149644 | Substation-Adjacent | 138 kV | 100 MW | 3.3 yrs | 55.9 |
| UNKNOWN118946 | Substation-Adjacent | 138 kV | 100 MW | 3.3 yrs | 55.4 |
| OZ Seminole | Greenfield | — | — | 3.5 yrs | 55.4 |
| TAP168556 | Substation-Adjacent | 69 kV | 50 MW | 3.3 yrs | 53.8 |
| UNKNOWN168557 | Substation-Adjacent | 69 kV | 50 MW | 3.3 yrs | 53.8 |
| TAP149647 | Substation-Adjacent | 69 kV | 50 MW | 3.3 yrs | 53.6 |
| TAP149169 | Substation-Adjacent | 69 kV | 50 MW | 3.3 yrs | 52.9 |
| UNKNOWN118876 | Substation-Adjacent | 69 kV | 50 MW | 3.3 yrs | 52.9 |
Seminole datacenter FAQ
- How many datacenter sites are in Seminole?
- 42 scored datacenter candidate sites, averaging 53.9/100 DC Readiness.
- Does Seminole offer datacenter tax incentives?
- Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.
- What is the natural-hazard risk in Seminole?
- FEMA's National Risk Index rates Seminole as "Relatively High" (score 42).
- What are industrial electricity rates in Seminole?
- Average industrial electricity is 5.80¢/kWh and commercial is 9.48¢/kWh in Seminole.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Seminole, Oklahoma. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.