Blue Wave Boats
IndustrialSeminole, Oklahoma · SPP
At a glance
Blue Wave Boats is an industrial datacenter candidate site in Seminole, Oklahoma, scoring 49.9/100 DC Readiness — 30th of 42 scored sites in the county. It sits in the SPP grid region and the OKLAHOMA GAS & ELECTRIC CO service territory, where interconnection has averaged 4.3 years from request to operation.
Power & interconnection
Speed to power
Middle-of-the-pack interconnection conditions for this grid.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
No notable statewide DC restriction on record; confirm local zoning and utility tariffs.
Incentive detail: Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.
Site location
Get alerts
Track Blue Wave Boats
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
How does Blue Wave Boats compare with other sites in Seminole?
Blue Wave Boats ranks 30th of 42 scored candidate sites in Seminole. Its 49.9/100 is roughly in line with the county average of 53.8. It is roughly in line with the Oklahoma average of 52.9 and roughly in line with the national average of 53.2.
Against the Oklahoma average, its strongest sub-score is natural hazard (58 vs 57) and its weakest is power availability (30 vs 39). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.
How close is Blue Wave Boats to power, fiber and other datacenters?
The nearest located transmission bottleneck is TMP526_32666 (SPP), 18 miles away. For connectivity, the nearest internet exchange facility is TierPoint Oklahoma City at 55 miles. 4 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is TierPoint Oklahoma City, 55 miles away.
What are the flood, water and hazard risks at Blue Wave Boats?
At the county level, FEMA's National Risk Index rates Seminole "Relatively High".
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Seminole, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| SEMINOLE | Substation-Adjacent | 345 kV | 600 MW | 4.3 yrs | 61.0 |
| OZ Seminole | Greenfield | — | — | 4.3 yrs | 59.7 |
| EC Near Seminole (OK) | Greenfield | — | — | 4.3 yrs | 58.6 |
| EC Near Seminole (OK) | Greenfield | — | — | 4.3 yrs | 57.9 |
| EC Near Seminole (OK) | Greenfield | — | — | 4.3 yrs | 57.7 |
| EC Near Seminole (OK) | Greenfield | — | — | 4.3 yrs | 57.3 |
| EC FFE Seminole County | Greenfield | — | — | 4.3 yrs | 57.3 |
| EC Near Seminole (OK) | Greenfield | — | — | 4.3 yrs | 57.3 |
Blue Wave Boats: common questions
What is the DC Readiness score of Blue Wave Boats?
Blue Wave Boats scores 49.9/100 on the GridCensus DC Readiness scale, rated fair. It ranks 30th of 42 scored sites in Seminole. The Seminole average is 53.8 and the Oklahoma average is 52.9.
Which electric utility serves Blue Wave Boats?
OKLAHOMA GAS & ELECTRIC CO (investor owned) holds the retail service territory that contains the site; its holding company is OG&E ENERGY.
What grid region is Blue Wave Boats in?
Blue Wave Boats is in the SPP region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.
How far is Blue Wave Boats from an internet exchange?
The nearest internet exchange facility is TierPoint Oklahoma City, about 55 miles away; 4 fiber providers report service at the location.
Related pages
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Blue Wave Boats, Seminole, OK”, https://gridcensus.com/datacenter-sites/oklahoma/seminole/blue-wave-boats-5db2b1fd (data as of October 10, 2026).
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for Blue Wave Boats, Seminole is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.