Seminole, Oklahoma · SPP

DC Readiness
55.9
Good / 100

TAP149644 is a substation-adjacent datacenter candidate site in Seminole, Oklahoma, interconnecting through SPP. It screens at 55.9/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP149644
Nearest grid bottleneckTMP526_32666 · 17 km (SPP)
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
UtilityOKLAHOMA GAS & ELECTRIC COinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth118
Avg queue wait3.3 yrs

Connectivity

Nearest IXPTierPoint Oklahoma City
IXP distance55.4 mi
Fiber providers4
Fiber coverage65.6%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low-Medium
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score58/100

Location context

Nearest datacenterTierPoint Oklahoma City
DC distance55.4 mi
County hazard (FEMA NRI)Relatively High (42)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.48¢/kWh
Industrial electricity5.80¢/kWh
Cooling degree days1,900
Heating degree days3,600
Land price / acre$2,633

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track TAP149644

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power20%
56
Fiber connectivity12%
66
Energy cost10%
50
Water risk7%
64
Natural hazard6%
58
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
30

Nearby comparable sites

Other scored datacenter candidate sites in Seminole, ranked by DC Readiness.

Sites near TAP149644
SiteTypeVoltageCapacityQueue waitScore
SEMINOLESubstation-Adjacent345 kV600 MW3.3 yrs60.9
OZ SeminoleGreenfield3.5 yrs60.1
EC Near Seminole (OK)Greenfield3.5 yrs59.0
EC Near Seminole (OK)Greenfield3.5 yrs58.3
EC Near Seminole (OK)Greenfield3.5 yrs58.1
EC FFE Seminole CountyGreenfield3.5 yrs57.7
EC Near Seminole (OK)Greenfield3.5 yrs57.7
EC Near Seminole (OK)Greenfield3.5 yrs57.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP149644, Seminole. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.