Staggs Project, F553

Industrial

Seminole, Oklahoma · SPP

DC Readiness
49.9
Fair / 100

At a glance

Staggs Project, F553 is an industrial datacenter candidate site in Seminole, Oklahoma, scoring 49.9/100 DC Readiness — 30th of 42 scored sites in the county. It sits in the SPP grid region and the OKLAHOMA GAS & ELECTRIC CO service territory, where interconnection has averaged 4.3 years from request to operation.

Power & interconnection

Nearest grid bottleneckTMP526_32666 · 43 km (SPP)
UtilityOKLAHOMA GAS & ELECTRIC COinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth108
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Nearest IXP321 S Boston Ave
IXP distance66.1 mi
Fiber providers4
Fiber coverage65.6%

Site characteristics

Site typeIndustrial
Land contactSeminole County County Assessor

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low-Medium
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score58/100

Location context

Nearest datacenterDatacenter 01387080629
DC distance56.9 mi
County hazard (FEMA NRI)Relatively High (42)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.48¢/kWh
Industrial electricity5.80¢/kWh
Cooling degree days1,900
Heating degree days3,600
Land price / acre$2,633

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Staggs Project, F553

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Staggs Project, F553 compare with other sites in Seminole?

Staggs Project, F553 ranks 30th of 42 scored candidate sites in Seminole. Its 49.9/100 is roughly in line with the county average of 53.8. It is roughly in line with the Oklahoma average of 52.9 and roughly in line with the national average of 53.2.

Against the Oklahoma average, its strongest sub-score is natural hazard (58 vs 57) and its weakest is power availability (30 vs 39). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Staggs Project, F553 to power, fiber and other datacenters?

The nearest located transmission bottleneck is TMP526_32666 (SPP), 26 miles away. For connectivity, the nearest internet exchange facility is 321 S Boston Ave at 66.1 miles. 4 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Datacenter 01387080629, 56.9 miles away.

What are the flood, water and hazard risks at Staggs Project, F553?

At the county level, FEMA's National Risk Index rates Seminole "Relatively High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
56
Fiber connectivity12%
67
Energy cost10%
50
Water risk7%
64
Natural hazard6%
58
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
30

Nearby comparable sites

Other scored datacenter candidate sites in Seminole, ranked by DC Readiness.

Sites near Staggs Project, F553
SiteTypeVoltageCapacityQueue waitScore
SEMINOLESubstation-Adjacent345 kV600 MW4.3 yrs61.0
OZ SeminoleGreenfield——4.3 yrs59.7
EC Near Seminole (OK)Greenfield——4.3 yrs58.6
EC Near Seminole (OK)Greenfield——4.3 yrs57.9
EC Near Seminole (OK)Greenfield——4.3 yrs57.7
EC Near Seminole (OK)Greenfield——4.3 yrs57.3
EC FFE Seminole CountyGreenfield——4.3 yrs57.3
EC Near Seminole (OK)Greenfield——4.3 yrs57.3

Staggs Project, F553: common questions

What is the DC Readiness score of Staggs Project, F553?

Staggs Project, F553 scores 49.9/100 on the GridCensus DC Readiness scale, rated fair. It ranks 30th of 42 scored sites in Seminole. The Seminole average is 53.8 and the Oklahoma average is 52.9.

Which electric utility serves Staggs Project, F553?

OKLAHOMA GAS & ELECTRIC CO (investor owned) holds the retail service territory that contains the site; its holding company is OG&E ENERGY.

What grid region is Staggs Project, F553 in?

Staggs Project, F553 is in the SPP region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

How far is Staggs Project, F553 from an internet exchange?

The nearest internet exchange facility is 321 S Boston Ave, about 66.1 miles away; 4 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Staggs Project, F553, Seminole, OK”, https://gridcensus.com/datacenter-sites/oklahoma/seminole/staggs-project-f553-7130c019 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Staggs Project, F553, Seminole is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.