Datacenter Sites in Allegany, New York
Allegany has 39 scored datacenter candidate sites averaging 51.7/100 DC Readiness, with a catalogued aggregate of 802 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.
At a glance
Allegany, New York has 39 scored datacenter candidate sites averaging 51.7/100 DC Readiness, roughly in line with the New York average of 54.0. It ranks 27th of 61 New York counties by number of sites and 44th by average score. The top-scoring site is Substation-Adjacent site · 0f16fa60 at 55.5/100.
Site-selection context for Allegany
Incentive detail: Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.
How does Allegany compare with other counties in New York?
By number of scored sites, Allegany ranks 27th of the 61 New York counties with a county page, holding 1.3% of the state's 2,980 sites. Its average DC Readiness of 51.7/100 ranks 44th in the state and is roughly in line with the national average of 53.0. Nationally it has the 993rd-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 5 score 55 or higher.
What types of datacenter sites are in Allegany?
Greenfield sites are the most common (16, 41% of the county's inventory), followed by former mine (11) and substation-adjacent (7). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in Allegany?
Industrial electricity averages 6.68¢/kWh and commercial 9.31¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (35). WRI water stress is low. 5 fiber providers report service in the county. The climate runs 700 cooling degree days a year with a mean temperature of 46°F. Land is valued around $3,316 an acre.
By site type
Top datacenter sites in Allegany
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN124588 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 55.5 |
| UNKNOWN124587 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 55.4 |
| UNKNOWN124581 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 55.4 |
| EC Near Hyland LFGTE Facility | Greenfield | — | — | 4.3 yrs | 55.2 |
| EC Near Hyland LFGTE Facility | Greenfield | — | — | 4.3 yrs | 55.1 |
| TAP140650 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 54.6 |
| UNKNOWN124589 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 54.6 |
| UNKNOWN124586 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 54.5 |
| UNKNOWN124585 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 54.5 |
| Hyland LFGTE Facility | Brownfield | — | 2 MW | 4.3 yrs | 54.5 |
| OZ Allegany | Greenfield | — | — | 4.3 yrs | 53.8 |
| OZ Allegany | Greenfield | — | — | 4.3 yrs | 53.7 |
| EC Near Hyland LFGTE Facility | Greenfield | — | — | 4.3 yrs | 53.6 |
| EC FFE Allegany County | Greenfield | — | — | 4.3 yrs | 53.3 |
| EC Near Hyland LFGTE Facility | Greenfield | — | — | 4.3 yrs | 53.3 |
| EC Near Hyland LFGTE Facility | Greenfield | — | — | 4.3 yrs | 53.3 |
| EC Near Hyland LFGTE Facility | Greenfield | — | — | 4.3 yrs | 53.2 |
| EC Near Hyland LFGTE Facility | Greenfield | — | — | 4.3 yrs | 52.9 |
| EC Near Hyland LFGTE Facility | Greenfield | — | — | 4.3 yrs | 52.8 |
| EC Near Hyland LFGTE Facility | Greenfield | — | — | 4.3 yrs | 52.8 |
| EC Near Hyland LFGTE Facility | Greenfield | — | — | 4.3 yrs | 52.6 |
| EC Near Hyland LFGTE Facility | Greenfield | — | — | 4.3 yrs | 52.4 |
| Howard Street Property | Industrial | — | — | 4.3 yrs | 49.5 |
| Mine Site | Former Mine | — | — | 4.3 yrs | 49.4 |
| Mine Site | Former Mine | — | — | 4.3 yrs | 49.4 |
Every scored site in Allegany
All 39 sites, best first.
- Substation-Adjacent site · 0f16fa60 · 55.5
- Substation-Adjacent site · d994d89c · 55.4
- Substation-Adjacent site · a6bbfe16 · 55.4
- EC Near Hyland LFGTE Facility · ac403d5a · 55.2
- EC Near Hyland LFGTE Facility · 29208960 · 55.1
- Substation-Adjacent site · 63d28f4a · 54.6
- Substation-Adjacent site · 6ce961e6 · 54.6
- Substation-Adjacent site · 55b037f7 · 54.5
- Substation-Adjacent site · 92a40c93 · 54.5
- Hyland LFGTE Facility · 54.5
- OZ Allegany · 8e0f4e38 · 53.8
- OZ Allegany · 04558fa9 · 53.7
- EC Near Hyland LFGTE Facility · 56b461c3 · 53.6
- EC FFE Allegany County · 53.3
- EC Near Hyland LFGTE Facility · 3e69453c · 53.3
- EC Near Hyland LFGTE Facility · 201b4f64 · 53.3
- EC Near Hyland LFGTE Facility · 684f704b · 53.2
- EC Near Hyland LFGTE Facility · e89417a7 · 52.9
- EC Near Hyland LFGTE Facility · cd7e18c9 · 52.8
- EC Near Hyland LFGTE Facility · 75b5f27c · 52.8
- EC Near Hyland LFGTE Facility · b091478a · 52.6
- EC Near Hyland LFGTE Facility · 421cdb89 · 52.4
- Howard Street Property · 49.5
- Mine Site · 7a7d6c2e · 49.4
- Mine Site · f8db603b · 49.4
- Mine Site · 98cd1f1e · 49.4
- Reed Road Landfill · 49.3
- Mine Site · 200ff626 · 49.2
- Mine Site · 0b9a23f8 · 49.2
- Mine Site · f465b759 · 49.1
- Greenfield (UNKNOWN124581 - TAP140650) · 48.9
- Mine Site · 5ea90cea · 48.8
- Mine Site · 6daa2a1c · 48.8
- EC Near Hyland LFGTE Facility · 1ca76f87 · 48.5
- Wellsville · 591d35c7 · 48.4
- WELLSVILLE VOR · 8d9bab67 · 48.3
- Mine Site · 8e224387 · 48.1
- Mine Site · a57db97b · 48.0
- Mine Site · b75fda07 · 48.0
Allegany datacenter FAQ
How many datacenter sites are in Allegany?
39 scored datacenter candidate sites, averaging 51.7/100 DC Readiness. That is the 27th-most of 61 New York counties with five or more sites.
What is the highest-scoring datacenter site in Allegany?
Substation-Adjacent site · 0f16fa60 scores 55.5/100 DC Readiness, the highest of the 39 scored sites in Allegany (a substation-adjacent site).
Does Allegany offer datacenter tax incentives?
Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.
What is the natural-hazard risk in Allegany?
FEMA's National Risk Index rates Allegany as "Relatively High" (score 35).
What are industrial electricity rates in Allegany?
Average industrial electricity is 6.68¢/kWh and commercial is 9.31¢/kWh in Allegany.
More in New York
- All datacenter sites in New York· 2,980 sites
- Operating datacenters in New York
- Electric substations in New York
- Niagara County· 237 sites · avg 53.5
- Erie County· 192 sites · avg 56.2
- Monroe County· 176 sites · avg 55.8
- Nassau County· 130 sites · avg 57.5
- Suffolk County· 101 sites · avg 56.4
- St. Lawrence County· 94 sites · avg 53.5
- Greenfield sites in New York
- Former Mine sites in New York
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 13, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in Allegany, New York”, https://gridcensus.com/datacenter-sites/new-york/allegany (data as of November 13, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for Allegany, New York is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.