Datacenter Sites in Allegany, New York

Allegany has 39 scored datacenter candidate sites averaging 51.7/100 DC Readiness, with a catalogued aggregate of 802 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

39
Candidate sites
51.7/100
Avg DC Readiness
802 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Allegany

Site-selection context for Allegany

Yessales_tax_exemption
Datacenter tax incentive
9.31¢/kWh
Commercial electricity
6.68¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$3,316
Land price / acre
700
Cooling degree days
6,100
Heating degree days
46°F
Mean annual temp

Incentive detail: Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.

By site type

Top datacenter sites in Allegany

Top datacenter sites in Allegany
SiteTypeVoltageCapacityQueue waitScore
EC Near Hyland LFGTE FacilityGreenfield3.5 yrs55.2
UNKNOWN124588Substation-Adjacent115 kV100 MW4.9 yrs55.2
EC Near Hyland LFGTE FacilityGreenfield3.5 yrs55.1
UNKNOWN124587Substation-Adjacent115 kV100 MW4.9 yrs55.1
UNKNOWN124581Substation-Adjacent115 kV100 MW4.9 yrs55.1
Hyland LFGTE FacilityBrownfield2 MW3.5 yrs54.5
TAP140650Substation-Adjacent115 kV100 MW4.9 yrs54.3
UNKNOWN124589Substation-Adjacent115 kV100 MW4.9 yrs54.3
UNKNOWN124586Substation-Adjacent115 kV100 MW4.9 yrs54.2
UNKNOWN124585Substation-Adjacent115 kV100 MW4.9 yrs54.2
OZ AlleganyGreenfield3.5 yrs53.8
OZ AlleganyGreenfield3.5 yrs53.7
EC Near Hyland LFGTE FacilityGreenfield3.5 yrs53.6
EC FFE Allegany CountyGreenfield3.5 yrs53.3
EC Near Hyland LFGTE FacilityGreenfield3.5 yrs53.3
EC Near Hyland LFGTE FacilityGreenfield3.5 yrs53.3
EC Near Hyland LFGTE FacilityGreenfield3.5 yrs53.2
EC Near Hyland LFGTE FacilityGreenfield3.5 yrs52.9
EC Near Hyland LFGTE FacilityGreenfield3.5 yrs52.8
EC Near Hyland LFGTE FacilityGreenfield3.5 yrs52.8
EC Near Hyland LFGTE FacilityGreenfield3.5 yrs52.6
EC Near Hyland LFGTE FacilityGreenfield3.5 yrs52.4
WELLSVILLE VORFederal Excess3.3 yrs51.8
WellsvilleFederal Excess3.3 yrs51.8
Howard Street PropertyIndustrial4.9 yrs49.2

Allegany datacenter FAQ

How many datacenter sites are in Allegany?
39 scored datacenter candidate sites, averaging 51.7/100 DC Readiness.
Does Allegany offer datacenter tax incentives?
Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.
What is the natural-hazard risk in Allegany?
FEMA's National Risk Index rates Allegany as "Relatively High" (score 35).
What are industrial electricity rates in Allegany?
Average industrial electricity is 6.68¢/kWh and commercial is 9.31¢/kWh in Allegany.

Dataset updated . Screening estimates derived from public data sources.