Skip to content
Gridcensus

Hyland LFGTE Facility

Brownfield

Allegany, New York · NYISO

DC Readiness
54.5
Fair / 100

Hyland LFGTE Facility is a brownfield datacenter candidate site in Allegany, New York, interconnecting through NYISO. It screens at 54.5/100 DC Readiness with a catalogued 2 MW of candidate capacity and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

Available capacity2 MW
LMP zoneNYISO_WEST
Wholesale LMP$47.55/MWh
Utility commercial rate0.09¢/kWh
UtilityROCHESTER GAS & ELECTRIC CORPinvestor ownedmoderate to large load · terms ≥ 25 MW

Speed to power

Interconnection outlookConstrained
≈ 3.5 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionNYISO
Queue depth95
Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate8%
Withdrawal rate92%

Connectivity

Nearest IXPVictory Technology Center
IXP distance55.9 mi
Fiber providers5
Fiber coverage71.3%
Nearest cloud providerGCP
Nearest cloud regionus-east5
Cloud region distance164.0 mi

Site characteristics

Site typeBrownfield
Land contactState Environmental Cleanup Program
Land owner typeprivate
Buildability92.0/100
Land cover (NLCD)Developed, Low Intensity
Former usegas
Existing capacity2 MW

Risk & environment

Environmental constraintLow (30/100)
Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteHYLAND LANDFILL
Hazard sub-score55/100
Construction cost index82.6 (avg 100)

Location context

Nearest datacenterLandmax Data Systems, Inc
DC distance52.5 mi
Nearest rail3.4 mi
Nearest gas pipeline2.3 mi
Nearest fiber route107.9 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.31¢/kWh
Industrial electricity6.68¢/kWh
Cooling degree days700
Heating degree days6,100
Land price / acre$3,316

Regulatory climate

Restrictivestate posture · as of 2026-08

First statewide moratorium (2026): 1-yr hold on certain permits for large DCs + impact study.

DC tax incentiveNo / suspended
Large-load threshold≥ 50 MW

Moratorium/permit hold targets large datacenters.

Incentive detail: Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Hyland LFGTE Facility

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
23
Speed to power20%
34
Fiber connectivity12%
68
Energy cost10%
70
Water risk7%
90
Natural hazard6%
55
Buildability7%
92
Labor market4%
50
DC cluster4%
45
Land / acreage3%
72
Construction cost3%
81
Gas pipeline2%
93
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Allegany, ranked by DC Readiness.

Sites near Hyland LFGTE Facility
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN124588Substation-Adjacent115 kV100 MW4.9 yrs55.2
EC Near Hyland LFGTE FacilityGreenfield3.5 yrs55.2
UNKNOWN124587Substation-Adjacent115 kV100 MW4.9 yrs55.1
UNKNOWN124581Substation-Adjacent115 kV100 MW4.9 yrs55.1
EC Near Hyland LFGTE FacilityGreenfield3.5 yrs55.1
UNKNOWN124589Substation-Adjacent115 kV100 MW4.9 yrs54.3
TAP140650Substation-Adjacent115 kV100 MW4.9 yrs54.3
UNKNOWN124586Substation-Adjacent115 kV100 MW4.9 yrs54.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen