UNKNOWN124589

Substation-Adjacent

Allegany, New York · NYISO

DC Readiness
54.3
Fair / 100

UNKNOWN124589 is a substation-adjacent datacenter candidate site in Allegany, New York, interconnecting through NYISO. It screens at 54.3/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 4.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN124589
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityNIAGARA MOHAWK POWER CORP.investor ownedmoderate to large load · terms ≥ 20 MW

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionNYISO
Queue depth95
Avg queue wait4.9 yrs

Connectivity

Nearest IXPVictory Technology Center
IXP distance66.0 mi
Fiber providers5
Fiber coverage71.3%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score65/100

Location context

Nearest datacenterLandmax Data Systems, Inc
DC distance63.1 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.31¢/kWh
Industrial electricity6.68¢/kWh
Cooling degree days700
Heating degree days6,100
Land price / acre$3,316

Regulatory climate

Restrictivestate posture · as of 2026-08

First statewide moratorium (2026): 1-yr hold on certain permits for large DCs + impact study.

DC tax incentiveNo / suspended
Large-load threshold≥ 50 MW

Moratorium/permit hold targets large datacenters.

Incentive detail: Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN124589

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
38
Fiber connectivity12%
70
Energy cost10%
50
Water risk7%
90
Natural hazard6%
65
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Allegany, ranked by DC Readiness.

Sites near UNKNOWN124589
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN124588Substation-Adjacent115 kV100 MW4.9 yrs55.2
EC Near Hyland LFGTE FacilityGreenfield3.5 yrs55.2
EC Near Hyland LFGTE FacilityGreenfield3.5 yrs55.1
UNKNOWN124581Substation-Adjacent115 kV100 MW4.9 yrs55.1
UNKNOWN124587Substation-Adjacent115 kV100 MW4.9 yrs55.1
Hyland LFGTE FacilityBrownfield2 MW3.5 yrs54.5
TAP140650Substation-Adjacent115 kV100 MW4.9 yrs54.3
UNKNOWN124585Substation-Adjacent115 kV100 MW4.9 yrs54.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen